Design (signalling scope) and turnkey construction on rail line 622 Gdów–Szczyrzyc
Original: Construction work – Zaprojektowanie (w zakresie branży srk) i kompleksowe wykonanie robót budowlanych na linii kolejowej nr 622 na odcinku G Gdów – Szczyrzyc w ramach Projektu pn. „Budowa nowej linii kolejowej Podłęże – Szczyrzyc – Tymbark / Mszana Dolna oraz modernizacja istniejącej linii kolejowej nr 104 Chabówka – Nowy Sącz – Etap II”
PKP Polskie Linie Kolejowe S.A.
- Value
- Not stated · check listing
- Closes
- 30 Nov 2026
- Where
- Poland
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Poland (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
PKP PLK is procuring design and turnkey construction of railway line 622 (Gdów–Szczyrzyc section G) in Poland, covering track, earthworks, structures, signalling, traction power, telecoms and environmental works. It suits large construction contractors and consortia with rail track record, not small sustainability firms.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
PKP Polskie Linie Kolejowe S.A. is procuring a design-and-build contract (zaprojektowanie i wykonanie robót) for the construction task 'Budowa obiektu budowlanego pn.: linia kolejowa nr 622 Gdów – Szczyrzyc', section G (km 17+487 to km 32+854), with related technical infrastructure along line 622 (km 17+036 to 32+973) and railway connection line 623 Fornale – Szczyrzyc, section G (km 9+668 to 10+105). The work forms part of the project 'Budowa nowej linii kolejowej Podłęże – Szczyrzyc – Tymbark / Mszana Dolna oraz modernizacja istniejącej linii kolejowej nr 104 Chabówka – Nowy Sącz – Etap II'. The scope covers two main parts. The first is design documentation, including the execution design (projekt wykonawczy) and as-built documentation, including geodetic as-built documentation. The second is construction works across many disciplines: track and subgrade, drainage and hydrotechnical works, external utility networks, roads, railway traffic control and signalling (srk), telecommunications, overhead contact line and traction power and control systems, non-traction line (LPN), low-voltage (up to 1 kV) electrical systems, engineering structures including railway tunnels, platforms, passenger facilities and buildings, level crossings and pedestrian crossings, geological and geotechnical works, small architecture, tree felling and environmental works, and other works required by law. The contract also includes environmental protection structures and the conformity assessment of structural subsystems at design, construction and final testing stages, with EC verification declarations and certificates delivered. An optional 'interface option' covers coordination with other contractors whose works require connection to the signalling equipment installed under this contract. Coordination runs through the Contracting Authority and/or the Engineer. Detailed interface scope is set out in Chapter 5 of Volume IV (PFU). The SWZ notes that the buyer may award follow-on contracts under art. 388 pt 2 lit. c of the Polish Public Procurement Law (repetition of similar designs and works, including demolition of degraded rail infrastructure, track and drainage works, tunnels and hydrotechnical works, roads, power, traction, telecoms, passenger facilities, sanitary and srk works, and clash removal with third-party networks). Such follow-on work may be awarded by negotiated procedure without prior publication. Expected duration is not stated on this page.
Key requirements
- Design (signalling scope and other disciplines) plus full construction of railway line 622 section G
- Scope includes track, earthworks, structures, tunnels, traction power, signalling, telecoms and environmental works
- Conformity assessment and EC verification declarations for structural subsystems required
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)