Works for complete or part construction and civil engineering work – Design, supply, and construction of battery energy storage systems in Poland as part of a renewable energy investment programme Tender
••••• organisation
Design, supply, and construction of two battery energy storage systems (13.4 MW / 26.8 MWh total) integrated with existing solar PV farms in Poland, including electrical infrastructure, cable routing, and grid connection. Bidders must have proven EPC capability in energy storage, electrical systems integration, and civil works for utility-scale renewable projects.
Unlock the funder, link and full detail
Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.
About this tender
Kompleksowe wykonanie pod klucz robót budowlanych i elektrycznych, prac projektowych oraz dostaw niezbędnych do realizacji inwestycji polegającej na budowie dwóch magazynów energii elektrycznej (MME): ME Jastrowie I (4,472 MW / 4,472 kWh) i ME Jastrowie II (8,944 MW / 8,944 kWh), o sumarycznej mocy 13,416 kW i pojemności 26,832 kWh. …
Relevant sectors
The direct link to bid is a Pro feature.