Design, Supply and Installation of Battery Energy Storage System (5.5 MW/11 MWh) 2026 Tender
••••• Bank
In context
This is a contract notice published by a multilateral institution covering construction and works. Delivery covers Grenada and Latin America (LatAm). It is classified under Energy Storage, Renewable Energy and Grid Modernization and 1 other against the sustainability taxonomy rather than matched on keywords.
This tender procures the design, supply, and installation of a 5.5 MW / 11 MWh battery energy storage system supporting climate resilience and renewable energy integration in Grenada. Bidders should have proven expertise in large-scale battery storage systems, grid integration, and experience with multilateral development bank procurement standards.
Unlock the funder, link and full detail
Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.
About this tender
Design, Supply and Installation of Battery Energy Storage System (5.5 MW/11 MWh) for the Government of Grenada and Grenada Electricity Services Ltd. (GRENLEC). The contract includes Design and Engineering Services, Plant and Equipment supply, Installation, Testing, Commissioning and Related Services, Site Coordination and Interface Management, and Maintenance Services including Non-Warranty Corrective and Unscheduled Services. …
The direct link to bid is a Pro feature.