Design, Supply, Installation and Commissioning of a Roof-Mounted Solar Photovoltaic (PV) System at The Enterprise Centre, Farnham
Waverley Borough Council
- Value
- £78K
- Closes
- 30 Nov 2026
- Where
- United Kingdom
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers United Kingdom (Europe). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
A council seeks a contractor to design, supply, install, test and commission a roof-mounted solar PV system at The Enterprise Centre in Farnham, estimated at £78K. It suits a local MCS-certified solar installer or SME electrical contractor with roofing and grid-connection experience.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Guildford Borough Council is seeking a suitably qualified and experienced contractor to design, supply, install, test and commission a roof-mounted Solar Photovoltaic (PV) system at The Enterprise Centre, Farnham. The project is part of the Council's commitment to reducing carbon emissions, improving energy efficiency and increasing renewable energy generation across its property portfolio. Note: the source page names Guildford Borough Council as the buyer, while the anchor context names Waverley Borough Council. The Enterprise Centre, Farnham falls within Waverley's area, so the buyer identity should be verified against the original notice. The page provides no detail on contract duration, deliverables beyond the scope above, or timescales.
Key requirements
- Design, supply, install, test and commission rooftop solar PV array
- Work performed on-site at The Enterprise Centre, Farnham
- Contract value approximately £78K, suited to SME installer capacity
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)