Skip to content
Raise Lens
Tender · TED (EU)

Electric accumulators – construction of battery energy storage facilities for MPGK Krosno

Original: Electric accumulators – „Budowa bateryjnych magazynów energii w obiektach należących do MPGK Krosno sp. z o.o.”

Miejskie Przedsiębiorstwo Gospodarki Komunalnej – Krośnieński Holding Komunalny Spółka z ograniczoną odpowiedzialnością

Value
Not stated · check listing
Closes
Not stated · check listing
Where
Poland
Contract
Works · Utility

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice published by a utility covering construction and works. Delivery covers Poland and the European Union (Europe). It is classified under Energy Storage, Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures design documentation and construction of three battery energy storage systems (200 kWh, 50 kW capacity) for a municipal utility in Poland to balance electricity supply within the enterprise and a local energy cluster. Bidders must be engineering/construction firms capable of full project delivery including permitting, grid-connection negotiation, and technical documentation across multiple disciplines.

Summary by Raise Lens from the official notice · 23 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Procurement for design documentation and construction of electric energy storage systems (battery storage) at three locations of MPGK Krosno sp. z o.o. The primary task (Task 2) involves building a 200 kWh / 50 kW energy storage facility at the company headquarters (ul. Fredry 12). Deliverables include complete design documentation: site survey map, building project (PZT+PAB), technical project (PT) by discipline, executive project (PW) by discipline, technical specification for execution and acceptance, operation and maintenance manual, bill of quantities, and investment cost estimate. The contractor is responsible for obtaining all necessary permits and approvals (building permit, environmental conditions decision, connection conditions to the power grid), preparing and submitting grid connection application, coordinating with local DSO (PGE Dystrybucja SA Rzeszów Branch), obtaining grid connection conditions, adapting and expanding existing equipment per connection terms, submitting executive project for DSO approval (NC RfG compliance), obtaining operational permits, and providing full author supervision throughout implementation.

Lots

  • Lot 2: Budowa magazynu energii elektrycznej na terenie siedziby MPGK Krosno na ul. Fredry 12

    Construction of 200 kWh / 50 kW energy storage facility at MPGK Krosno headquarters, ul. Fredry 12, including design documentation and all permitting/grid connection activities

Key requirements

  • Complete project documentation (architectural, technical, executive designs across disciplines)
  • Obtain building permit and environmental/zoning decisions
  • Prepare and negotiate grid-connection application with local DSO (PGE Dystrybucja SA)
  • Construct three battery energy storage systems (200 kWh / 50 kW capacity minimum)
  • Provide operation and maintenance manuals and technical specifications

Procurement contact

The notice names a procurement contact for clarification questions.

CPV codes

Relevant sectors

How this compares

About this sector

Energy storage funding spans batteries, long-duration storage, thermal storage and the controls that dispatch them. Research calls focus on chemistry and system cost. Demonstration programmes test grid services, while tenders buy capacity, flexibility and installation contracts. Buyers usually want evidence of safety certification, round-trip efficiency and a credible route to grid connection.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published15 Jun 2026
Buyer typeUtility
TypeWorks
DeliveryOn-site
Site visitRequired
CountryPoland
RegionEurope
CurrencyPLN
Last verified23 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)