Skip to content
Raise Lens
Tender · TED (EU)

Electrical installation work – Modernizare RED 110kV din zona Smardan-Barbosi-Filesti-Arcelor Mittal si modernizare si integrare in SCADA statia 110/20/6kV Filesti, jud. Galati

DISTRIBUȚIE ENERGIE ELECTRICĂ ROMANIA S.A.

Value
RON 97.9M
Closes
Not stated · check listing
Where
Romania
Contract
Works · Utility

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice published by a utility covering construction and works. Delivery covers Romania and the European Union (Europe). It is classified under Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Modernization of a 110 kV electrical distribution network and integration of a 110/20/6 kV substation into SCADA control systems in Galați, Romania. Bidders must have expertise in high-voltage electrical infrastructure design, construction, and automation systems integration.

Summary by Raise Lens from the official notice · 13 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Electrical installation work for modernization of a 110kV power distribution network in the Smardan-Barbosi-Filesti-Arcelor Mittal area and modernization/SCADA integration of the 110/20/6kV Filesti substation in Galati County, Romania. Object 1 involves reconfiguration of 110kV aerial lines (LEA) and conversion to mixed aerial/underground lines (LEA/LES) for power transit between Filesti and Smardan stations, including two circuits of approximately 8.35 km and 13.4 km respectively. Object 2 encompasses complete modernization of the 110/20/6kV Filesti substation including replacement of primary circuit equipment in 110kV and 20kV cells, modernization of secondary circuits with digital microprocessor-based control and protection systems, construction works, and line differential protection implementation. Execution duration: 36 months, not later than December 2027. Partially financed from the Modernization Fund for energy infrastructure.

Bidder eligibility

Standard sectoral procurement requirements for electrical utility infrastructure contractors. Bidders must comply with technical and professional standards applicable to 110kV high-voltage electrical systems, demonstrate relevant experience with substation modernization and power distribution network reconfiguration, meet financial standing requirements per Romanian Law 99/2016, and hold necessary registrations and classifications for electrical installation works on public utility infrastructure.

How bids are scored

Evaluation criteria not explicitly detailed in the provided text. Standard procurement procedures under Romanian Law 99/2016 (Sectoral Procurement Law) apply. Contract modifications without additional procurement procedures are permitted within the framework of the law and contract models provided.

Lots

  • Lot 1: Modernizare RED 110 kV din zona Smârdan-Barboși-Filesti-Arcelor Mittal

    Reconfiguration of 110kV aerial lines and conversion to mixed aerial/underground lines for power transit between Filesti and Smardan stations, with two circuits of 8.35 km and 13.4 km respectively, including sectioning of existing circuits and installation of flexible connections.

  • Lot 2: Modernizare staţia 110/20/6kV Filești

    Substation modernization including: replacement of primary circuit equipment in 110kV and 20kV cells; modernization of secondary circuits with digital microprocessor-based control and protection systems with distributed open architecture; construction and technological buildings; line differential protection realization at neighboring stations; SCADA integration and digitalization.

Key requirements

  • 110 kV overhead and underground electrical line reconfiguration and modernization
  • Substation 110/20/6 kV modernization and SCADA integration at Filești
  • High-voltage electrical installation, testing, and commissioning expertise
  • Coordination with multiple landowners and Transelectrica infrastructure
  • Flexible conductor installation (Al-Ol 450/75 mm²) and circuit switching

CPV codes

Relevant sectors

Grid Mod tendersInfrastructure

How this compares

About this sector

Grid modernisation covers transmission, distribution, smart meters, interconnectors and the software that balances a network with more variable supply. Funding comes as innovation calls for network operators and suppliers as well as large public tenders for equipment and works. Applicants are usually asked to show technical readiness and experience working with regulated network companies.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published14 Sep 2026
Buyer typeUtility
TypeWorks
DeliveryOn-site
CountryRomania
RegionEurope
CurrencyRON
Budget rangeRON 97.9M
Last verified13 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)

Related tenders