Transformer Substation – DDE Design, As Built and Execution - Complete Modernization of 110/ 20 kV Zimnicea Station to Increase Electrical Supply Safety for Consumers and Ensure Technical Conditions for Renewable Energy Integration and SCADA Integration, Zimnicea, Teleorman County
Original: Transformer substation – Proiectarea DDE, As Built si executia -Modernizare totala statia 110/20 kV Zimnicea in vederea cresterii gradului de siguranta in alimentarea cu energie electrica a consumatorilor si asigurarii conditiilor tehnice de preluare a energiei produse din surse regenerabile si integrare in SCADA, loc. Zimnicea,jud. Teleorman
- Value
- RON 20.5M
- Closes
- Not stated · check listing
- Where
- Romania
- Contract
- Works · Utility
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a utility covering construction and works. Delivery covers Romania and the European Union (Europe). It is classified under Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures the design, as-built documentation, and construction of a complete modernization of a 110/20 kV transformer substation in Zimnicea, Romania, to improve electrical supply reliability and integrate renewable energy sources with SCADA controls. Bidders should be experienced electrical infrastructure contractors capable of substation design, equipment installation, and grid integration work.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Procurement of design (DDE), As-Built documentation, and execution of complete modernization of the 110/20 kV transformer substation in Zimnicea, Teleorman County, Romania. The project aims to increase safety in electricity supply to consumers, ensure technical conditions for integration of renewable energy sources, and integrate the facility into the SCADA system. The work includes provision of materials and equipment by the buyer (DEO). Deliverables include detailed design, as-built documentation, and complete construction/modernization execution. Estimated duration not specified in available text.
Key requirements
- Design (DDE) and as-built documentation for 110/20 kV substation modernization
- Complete construction and execution of substation upgrade at Zimnicea, Teleorman county
- Integration of renewable energy source accommodation and SCADA system connectivity
- Compliance with technical specifications in the descriptive document and terms of reference
- Contingency costs not to exceed 4.1% of bid value; EU co-financing (€28.6M) and state funds (€7.7M) available
Relevant sectors
How this compares
About this sector
About this sector
Grid modernisation covers transmission, distribution, smart meters, interconnectors and the software that balances a network with more variable supply. Funding comes as innovation calls for network operators and suppliers as well as large public tenders for equipment and works. Applicants are usually asked to show technical readiness and experience working with regulated network companies.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)