Summary

A purchasing group of Upper Silesian-Zagłębie Metropolis public bodies is procuring comprehensive electricity supply and distribution for 2027-2028, including net-metering settlement of energy from their photovoltaic installations. Licensed electricity suppliers and energy retailers with capacity for large public-sector volumes are the natural bidders.

Summary by Raise Lens from the official notice · 25 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The procurement covers a comprehensive electricity service, as defined in the Polish Energy Law (art. 3 pt 30 and art. 5 sec. 3), for members of the Upper Silesian-Zagłębie Metropolis purchasing group. The contractor would supply electricity and provide electricity distribution services for the consumption points of the contracting authorities and their organisational units, based on the estimated volumes specified in the Specification (OPZ). The delivery period runs from 01.01.2027 to 31.12.2028, a 24-month term. The contract is specific to sites with photovoltaic installations. The contractor must settle electricity generated and fed back into the grid in line with the Renewable Energy Sources Act, preserving the net-metering scheme under art. 4 sec. 1 pts 1 or 2 and art. 4 sec. 1a pt 1 lit. a or b, depending on installed capacity. Under art. 4 sec. 4 pt 2, the contractor bears distribution charges on the difference between energy drawn from and fed into the grid. Distribution charges are billed under the current DSO tariffs, and the contracting authorities pay them.

Key requirements

  • ✓Comprehensive electricity supply and distribution service under Polish Energy Law, 01.01.2027 to 31.12.2028
  • ✓Net-metering settlement of PV-generated energy fed into the grid per Renewable Energy Sources Act art. 4
  • ✓Winning supplier bears distribution-related costs for net energy balance differences and bills current DSO tariffs

CPV codes

Relevant sectors

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.