Engineering design for seven at-grade junctions converted to roundabouts, Thessaloniki–Edessa
Original: Engineering design services for the construction of civil engineering works – Αναμόρφωση επτά (7) τυπικών ισόπεδων κόμβων σε κυκλικούς επί της ΕΟ 2 Θεσσαλονίκης – Έδεσσας (χ.θ. 12+000 έως 43+600)
ΠΕΡΙΦΕΡΕΙΑ ΚΕΝΤΡΙΚΗΣ ΜΑΚΕΔΟΝΙΑΣ
- Value
- Not stated · check listing
- Closes
- 11 Jan 2027
- Where
- Greece
- Contract
- Consulting · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering consulting. Delivery covers Greece (Europe). It is classified under Environmental Justice against the sustainability taxonomy rather than matched on keywords.
Summary
A Greek regional authority is procuring engineering design services to reconfigure seven at-grade junctions into roundabouts on the Thessaloniki–Edessa national road, within the existing right-of-way. It suits engineering consultancies with road design experience; the sustainability link is limited to safety and capacity improvements.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The contracting authority, the Region of Central Macedonia, is procuring engineering design services for the redesign of seven typical at-grade intersections converted into roundabouts on the Thessaloniki–Edessa National Road (EO 2). The study will investigate the feasibility of reconfiguring these junctions. The stated objectives are to improve junction operation, increase road safety, raise traffic capacity, and improve the level of service on the road section under study. All proposed interventions must be carried out within the existing expropriation (right-of-way) zone of the current infrastructure. The seven junctions, identified by chainage, are: Sindos (at Sidenor, km 12+020), Anchialos (km 15+050), Gefyra (km 23+700), Chalkidona (km 32+400), Koufalia (km 33+370), the Paralimni bypass entry (km 34+470), and Paralimni (km 43+600). The page does not state the contract duration, deliverables in detail, or the estimated value.
Key requirements
- Engineering design study for reconfiguring seven at-grade junctions into roundabouts on EO 2 Thessaloniki–Edessa
- Interventions must stay within the existing road expropriation zone
- Objectives: road safety, traffic capacity and level of service improvement
Relevant sectors
How this compares
About this sector
About this sector
Environmental justice funding supports communities most exposed to pollution and climate harm, with an emphasis on local leadership. It is offered by public programmes and foundations, often as grants to community organisations and partnerships. Calls typically ask how residents are involved in decisions and how benefits stay in the community.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)