Skip to content
Raise Lens
Tender · TED (EU)

Engineering design services – Budafoki Road tram line design – north

Original: Engineering design services – Budafoki úti villamosvonal tervezése - észak

BKK Budapesti Közlekedési Központ Zártkörűen Működő Részvénytársaság

Value
Not stated · check listing
Closes
17 Dec 2026
 
Where
Hungary
Contract
Consulting · Soe

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 32 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 15 Nov 202632 days to prepare
Found today · 24 Nov 202623 days to prepare

In context

This is a contract notice published by a state-owned enterprise covering consulting. Delivery covers Hungary (Europe). It is classified under Sustainable Buildings and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

BKK, Budapest's transport authority, is procuring design services for the northern section of the Budafoki tram line, covering permitting, construction and tender documentation, feasibility study and environmental impact assessment. Suited to engineering design consultancies with rail or tram design experience and permitting capability in Hungary.

Summary by Raise Lens from the official notice · 18 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The buyer, BKK Budapesti Közlekedési Központ Zrt., is procuring engineering design services for the northern section (Irinyi József utca – Építész utca) of the Budafoki úti tramline, designated Task 1 of a three-part tram line design project. The scope covers the decision-preparation documentation and its underlying studies: route investigation across the full planning area (Irinyi József utca to Budafok railway station), cross-section analysis limited to Irinyi József utca – Építész utca, road traffic modelling of the affected network (including Route 6 and the Nagytétényi út section in District XXII), and detailed traffic studies at the Etele út / Fehérvár út, Budafoki út / Dombóvári út and Irinyi József utca / Bogdánffy út junctions. The design deliverables include approximately 3.4 km of new track and associated public space on the Bogdánffy út – Budafoki út alignment up to Építész utca, 0.35 km of new track on Hengermalom út between Szerémi út and Budafoki út, a passenger-transfer terminus at Építész utca, a new junction turning track at Etele út / Fehérvári út, road capacity expansion on Hauszmann Alajos utca between Szerémi út and Budafoki út, full renewal of affected public spaces, and accessible platform design. The contractor must also prepare the building permit and construction design, obtain all final permits and approvals, produce the feasibility study, the environmental impact study (and an environmental impact assessment if required), and the tender documentation for selecting the construction contractor. An optional task covers design supervision (up to 60 engineer-days) in general and specific parts, as set out in the technical specification. Tasks 2 (Építész utca – Savoya Park) and 3 (Savoya Park – Budafok railway station) depend on Task 1's decision-preparation documentation and will be procured separately. The contract duration is not stated in the extracted text.

Key requirements

  • Design of about 3.4 km new tram track and 0.35 km on Hengermalom út, including construction permit and construction-stage design
  • Traffic studies, route analysis, cross-section and road traffic modelling, plus environmental impact assessment and feasibility study
  • Preparation of tender documentation for contractor selection and obtaining all final permits and approvals

CPV codes

Relevant sectors

Buildings tendersInfrastructure

How this compares

About this sector

Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published13 Nov 2026
Closes17 Dec 2026, 00:00 UTC
Buyer typeSoe
TypeConsulting
CountryHungary
RegionEurope
Last verified18 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)