Skip to content
Raise Lens
TENDER · TED (EU)governmentservices

Engineering design services – Csapókerti Primary School renovation planning 2026 Tender

Original: Engineering design services – Csapókerti Ált. Iskola felújításának tervezése

Debrecen Megyei Jogú Város Önkormányzata

In context

This is a contract notice published by a government body covering services. Bids are invited through an open procedure. Delivery covers Hungary and the European Union (Europe). It is classified under Energy Efficiency, Sustainable Buildings and Heating and Cooling and 1 other against the sustainability taxonomy rather than matched on keywords.

Summary

Procurement of engineering design services for comprehensive renovation of a primary school building in Debrecen, Hungary, including structural, energy, heating, and accessibility upgrades. Suitable bidders are architectural and engineering design firms with experience in school building renovation, energy efficiency retrofits, and heritage-sensitive design.

Summary by Raise Lens from the official notice · 21 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The procurement covers preparation of design documentation for the complete renovation of Csapókerti Általános Iskola (a primary school) in Debrecen. The buyer is Debrecen Megyei Jogú Város Önkormányzata. The work has two stages. First, approval-stage documentation: photo documentation of the existing building, current-state surveys across all disciplines, site and floor plan variants, changed elevations, technical descriptions, a cost estimate, a renovation schedule, energy calculations for the existing and planned states, and a certified energy certificate for the existing state. Second, execution-stage documentation under Government Decree 191/2009 (IX.15.) and Act LXIX of 2023, including all trade drawings, a room book, built-in furniture and bespoke-element drawings, and priced and unpriced itemised bills of quantities using the prescribed cost-item system. The renovation scope includes roof repairs after water damage, energy and interior upgrades including electrical networks, heating system modernisation, a community space and new or refurbished sanitary blocks, full gymnasium renovation, yard development, renovation of two buildings used as canteens, an outdoor classroom in the front garden, fence and gate repair or replacement, fire-safety system review, and an assessment of expanding the photovoltaic system. The building is under local heritage protection under Debrecen municipal decree 19/2023 (VI.22.), and step-free accessibility must be addressed, as there is currently no accessible toilet. Disciplines required include architecture, structure, timber preservation, building services, building electrical, landscape, utilities, fire protection and accessibility. The designer must hold design meetings with the City Hall Urban Development Department at most every two weeks, with minutes recorded, and must obtain acceptance from the Preparatory Client. The Asset Manager (Debreceni Tankerületi Központ) reviews the approval documentation and cost estimate, and the Preparatory Client approves them before further design proceeds. The designer must also answer written questions during the subsequent contractor-selection procurement and correct deficiencies, and provide design supervision under Decree 25/2024 (VIII.8.) ÉKM, Section 8. The contract duration is not stated in the available text.

Key requirements

  • ✓Photographic documentation prior to renovation
  • ✓Approval design documentation with cost estimate and renovation schedule
  • ✓Detailed execution design documentation with priced and unpriced budgets
  • ✓Roof structure and waterproofing repairs (thermal and water insulation)
  • ✓Energy modernization and internal upgrades including electrical systems
  • ✓Heating system modernization
  • ✓Community space and wet-block renovation
  • ✓Gymnasium full renovation
  • ✓Courtyard development
  • ✓Fire protection system review and compliance assessment
  • ✓Solar panel system expansion feasibility study
  • ✓Accessibility improvements for building use
  • ✓Compliance with local heritage protection regulations (local protected status)

How this compares

  • Compared with 14 similar tenders (efficiency in Hungary) listed in the last 12 months.
  • It allows 20 days to respond, longer than the typical 15 days across 8 similar tenders.
  • The same organisation listed 3 other similar tenders here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.