Engineering design services for railway section optimization Čelákovice–Mstětice, level-crossing replacement
Original: Engineering design services for the construction of civil engineering works – Optimalizace traťového úseku Čelákovice (mimo) - Mstětice (včetně) - úprava dokumentace - náhrada přejezdu P2725 - D6
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- Czech Republic
- Contract
- Services · Soe
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a state-owned enterprise covering services. Delivery covers Czechia and the European Union (Europe). It is classified under Sustainable Buildings and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures engineering design services, project documentation, site supervision, and safety coordination for railway infrastructure optimization between Čelákovice and Mstětice in the Czech Republic, including level-crossing replacement. Bidders should be engineering design firms with railway/civil infrastructure expertise and experience in safety management and environmental impact assessment.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Engineering design services for the construction of civil engineering works on the railway section Čelákovice (outside) - Mstětice (including) - documentation update - replacement of level crossing P2725 on the D6 line. The scope includes: preparation of Project Documentation for joint/building permit, preparation of Project Documentation for construction execution, provision of author's supervision during construction execution, and activity of BOZP (occupational safety and health) coordinator during construction site preparation phase including preparation of construction site safety plan and maintenance manual. The contract also includes preparation of EIA (Environmental Impact Assessment) background materials for subsequent proceedings based on already-issued statements.
Key requirements
- Project documentation for building permit and construction execution
- Site supervision and author's oversight during construction
- Safety coordinator role during site preparation phase, including safety plan and maintenance manual
- Environmental impact assessment (EIA) documentation preparation
Relevant sectors
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)