Engineering design services railway station building reconstruction Pardubice phase 2
Original: Engineering design services for the construction of civil engineering works – "Rekonstrukce výpravní budovy v žst. Pardubice" - 2. etapa (hala, křídla)
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- Czech Republic
- Contract
- Consulting · Soe
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a state-owned enterprise covering consulting. Delivery covers Czechia and the European Union (Europe). It is classified under Sustainable Buildings and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Engineering design services for reconstruction of Pardubice railway station building (phase 2: hall and wings), including project documentation for building permit and construction, BOZP coordination, and site supervision. Bidders should be civil engineering design firms with railway infrastructure and heritage restoration expertise.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Engineering design services for the reconstruction of the dispatch building at Pardubice railway station, stage 2 (hall and wings). The scope includes preparation of project documentation for building permit (DSP) and for construction execution (PDPS) in accordance with Czech regulations (decree 146/2008 Sb.), public consultation procedures, securing all necessary documentation for building permit issuance, and provision of safety coordinator services (BOZP) during construction preparation phase per law 309/2006 Sb. Services also encompass: preparation of building permit applications with all required documents and attachments; preparation of tender documentation for construction works; procurement of conformity certificates from notified bodies per EU directives on conventional railway system interoperability; coordination with stage 1 reconstruction (high-rise building); consultation with National Heritage Institute; and cost determination per SŽDC directive 20. The designer shall provide cost budgets at preparation stage 3 and execution stage 4.
Bidder eligibility
Not explicitly stated in provided content. Bidders must comply with Czech public procurement regulations and be capable of delivering engineering design services for railway infrastructure projects. Professional qualifications in railway civil engineering and ability to work with Czech regulatory framework required.
How bids are scored
Not explicitly stated in provided content.
Key requirements
- Project documentation for building permit (DSP) per Czech transport construction regulations 146/2008
- Project documentation for construction execution (PDPS) with complete tender-bid packages
- BOZP safety coordinator role during design preparation phase per law 309/2006
- Architect's supervision during construction implementation
- Compliance certification coordination with notified bodies for railway interoperability directives
- Coordination with phase 1 reconstruction and heritage institute (National Monument Institute) approval
- Cost estimation per SŽDC Directive 20 at design (stage 3) and execution (stage 4) phases
Relevant sectors
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)