Environmental impact study for ground-mounted solar plant in Digoin
Original: Réalisation d'une étude d'impact environnementale, centrale photovoltaïque au sol à Digoin
SEM SELER
- Value
- Not stated · check listing
- Closes
- 4 Dec 2026
- Where
- France
- Contract
- Services · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering services. Delivery covers France (Europe). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The tender procures an environmental impact assessment (EIE) for a roughly 6 MWc ground-mounted solar PV plant at Digoin, Saône-et-Loire, split into two lots. It suits environmental consultancies or engineering studies firms with French EIA and solar-project experience, including SMEs.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
A French local authority is seeking environmental consultancy services to carry out an environmental impact assessment for a ground-mounted solar photovoltaic plant of roughly 6 MWc, to be built on a former landfill site at Le Tonkin in Digoin, Saône-et-Loire. Bidders are expected to have experience with French environmental impact assessments and solar projects. Offers are submitted electronically through the buyer's public procurement profile. The notice was published on 3 November 2026 and closes on 4 December 2026 at 18:00 UTC.
Full description from the source
The buyer, SEM SELER (Macon, Saône-et-Loire), is procuring an environmental impact assessment (étude d'impact environnementale, EIE) for a ground-mounted photovoltaic plant of about 6 MWp at Le Tonkin in Digoin (71160), on a former urban site currently being backfilled. The contract is split into two lots. Lot 1 covers the complete impact assessment excluding the landscape component. Lot 2 covers the landscape component of the impact assessment. Variants are permitted. The procedure is a procédure adaptée (adapted procedure) under the French public procurement code. The contract runs for 30 months from notification. Bids must remain valid for 90 days from the submission deadline. The buyer's internal reference is 2026_EIE_CPV_DIGOIN. Delivery and execution location is the buyer's address in Mâcon.
Lots
- Lot 1: Lot 1 – Etude d'impact complète hors volet paysager
Complete environmental impact assessment for the Digoin ground-mounted PV project, excluding the landscape component.
- Lot 2: Volet paysager de l'étude d'impact
Landscape component of the environmental impact assessment for the Digoin ground-mounted PV project.
Key requirements
- Carry out environmental impact assessment for ~6 MWc ground-mounted PV plant
- Site at Tonkin lieu-dit, Digoin (71160) on a former landfill site under backfilling
- Tender divided into 2 lots
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
How this compares
- Compared with 122 similar tenders (renewables in France) listed in the last 12 months.
- Similar tenders that state a value range from $17k to $7.9m, with a median of $275k (17 tenders).
- It allows 32 days to respond, longer than the typical 30 days across 99 similar tenders.
- This is the only similar tender from this organisation listed here in the last 12 months.
Closest open tenders
- Hydro-mechanical structures construction work – formal procedure
- Replacement of rooftop photovoltaic plant on buildings D and E
- Roof refurbishment, structural reinforcement and photovoltaic canopy installation works
- Preparatory works for photovoltaic carport installation - generator room construction
- Construction and operation of photovoltaic power plants
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)