Hydro-mechanical structures construction work – formal procedure

Original: Construction work for hydro-mechanical structures – Procédure formalisée

SHEM ENGIE

Value
Not stated · check listing
Closes
25 Nov 2026
 
Where
France
Contract
Works · Utility

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 19 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 6 Nov 202619 days to prepare
Found today · 24 Nov 20261 day to prepare

In context

This is a contract notice published by a utility covering construction and works. Delivery covers France (Europe). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

SHEM ENGIE is procuring hydro-mechanical works on the spillway gates of a hydroelectric dam in France, in two phases from 2027 to 2029, covering design studies, manufacture, installation, testing and handover of gate hoists and hydraulic power units. This suits established hydro-mechanical engineering contractors with dam-safety experience rather than early-stage startups.

Summary by Raise Lens from the official notice · 18 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The contract covers construction work on the safety devices (organes de sûreté) of a hydroelectric dam operated by SHEM ENGIE. The work runs in two phases and includes execution studies, attendance at site progress meetings, and preparation of the end-of-contract file (Dossier de fin d'affaires). Phase 1 (March 2027 to August 2028) concerns the spillway gate EVCRD3 (Evacuateur de Crue Rive Droite n°3). The contractor must set up and remove the site on the dam crest (altitude 420 m NGF), manufacture in workshop, install, commission and hand over one operating unit (one winch, one oil-hydraulic power unit and one standby oil-hydraulic power unit). It must also take part in acceptance tests led by SHEM, carry out modifications, adjustments and snagging after those tests, and supply all equipment, access and lifting needed for the work. Phase 2 (September 2028 to September 2029) concerns spillway gates EVCRD2 and EVCRD1. The same site set-up, workshop manufacture, installation, commissioning, handover, acceptance-test support, post-test corrections and provision of equipment, access and lifting apply, for two operating units (two winches and two oil-hydraulic power units). The overall expected duration runs from March 2027 to September 2029.

Key requirements

  • Execution design studies, site meetings and end-of-contract documentation
  • Manufacture, installation, commissioning and handover of one winch and hydraulic power units on EVCRD3 (March 2027 to August 2028)
  • Manufacture, installation and commissioning of two winches and two hydraulic power units on EVCRD2 and EVCRD1 (September 2028 to September 2029), with site setup on the dam crest at 420 m NGF

CPV codes

Relevant sectors

Renewables tendersInfrastructure

How this compares

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published6 Nov 2026
Closes25 Nov 2026, 00:00 UTC
Buyer typeUtility
TypeWorks
DeliveryOn-site
CountryFrance
RegionEurope
Last verified18 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)