Flood-affected zones rehabilitation: project management assistance for bridge construction monitoring 2026 Tender
Original: Programme de réhabilitation des zones sinistrées par les inondations dans le sud-est du royaume : mission d’assistance à maitrise d’ouvrage pour le suivi des travaux de construction d'un ouvrage d'art au PK 913+800 (ex PK
CHARGE DE LA DIRECTION PROVINCIALE D'EQUIPEMENT DE ZAGORA
- Value
- Not stated · check listing
- Closes
- 12 Nov 2026
- Where
- Morocco
- Contract
- Consulting · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering consulting. Bids are invited through an open procedure. Delivery covers Morocco (MENA). It is classified under Climate Adaptation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This open tender from the Zagora provincial equipment directorate procures project management assistance to supervise construction of a bridge-type structure (ouvrage d'art) at PK 913+800, part of a flood-recovery programme in south-east Morocco. It suits engineering consultancies with public works supervision experience in Morocco, and is likely less suited to early-stage firms without local track record.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Programme de réhabilitation des zones sinistrées par les inondations dans le sud-est du royaume : mission d’assistance à maitrise d’ouvrage pour le suivi des travaux de construction d'un ouvrage d'art au PK 913+800 (ex PK Procédure : Appel d'offres ouvert Lieu d'exécution : Province de Zagora Référence : 43/2026/dpetdezagora
Key requirements
- Project management assistance (AMO) for supervising bridge structure construction works at PK 913+800
- Part of flood-affected zone rehabilitation programme in Zagora province
- Open tender; bidder experience and qualification criteria per Moroccan public procurement rules
Relevant sectors
How this compares
How this compares
- Compared with 35 similar tenders (adaptation in Morocco) listed in the last 12 months.
- It allows 13 days to respond, longer than the typical 11 days across 34 similar tenders.
- The same organisation listed 8 other similar tenders here in the last 12 months.
Closest open tenders
- Study for developing flood risk prevention plans in Larache and Tetouan provinces
- Equipment for flood risk management centre, Guir-Ziz-Rheris Basin Agency
- Study and supervision of works for Greater Nador flood protection, phase 2
- Quality control and monitoring of bridge construction on RN17, flood rehabilitation programme
- Flood-affected areas rehabilitation programme, South-East Morocco: quality control of bridge reconstruction
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →