Skip to content
Raise Lens
Tender · TED (EU)

General contractor services for charging infrastructure of new bus depot, lot 2

Original: Building construction work – DSW21; Generalunternehmerleistungen für die Errichtung der Ladeinfrastruktur (Neubau eines Betriebshofes für diesel-, elektro- und ggf. wasserstoffbetriebene Busse am Standort Castrop-Rauxel) (Los 2)

DSW21 Dortmunder Stadtwerke AG

Value
Not stated · check listing
Closes
21 Dec 2026
 
Where
Germany
Contract
Works · Utility

Free accounts: 1 official link a month · Pro: every link

Pro early accessIn public feeds and alerts from 30 Nov. This page is open to everyone now.

Raise Lens Pro

With Pro you could have had 28 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 23 Nov 202628 days to prepare
Found today · 25 Nov 202626 days to prepare

In context

This is a contract notice published by a utility covering construction and works. Delivery covers Germany (Europe). It is classified under Electric Mobility, Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

DSW21, a German municipal utility, is procuring a turnkey general contractor package to build the electrical charging infrastructure (10 kV switchgear, seven 2,000 kVA transformers, busbars, fast and slow chargers, pantographs) for an electric bus depot in Castrop-Rauxel. Suited to large electrical general contractors or EV-charging system integrators with depot-scale energy construction experience.

Summary by Raise Lens from the official notice · 24 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

DSW21 Dortmunder Stadtwerke AG is building a new bus depot in Castrop-Rauxel (Mengeder Straße, former Zeche Graf Schwerin site) for electric buses, with diesel buses operating during a transition period. The depot includes a storage and charging hall for 58 buses (12 m solo and 18 m articulated), a transformer building, a driver services building, a workshop building, a fuelling and washing hall, and external areas. It operates 24/7. This tender (Lot 2) covers the turnkey, operational construction of the energy supply for charging the electric buses, from the medium-voltage handover point of the grid operator to the pantographs at each parking position. The scope includes works and installation planning, testing, commissioning and documentation. Main deliverables are a 10 kV medium-voltage switchgear in the transformer building with handover to the grid operator; seven 2,000 kVA transformers in separate chambers; busbar systems supplying the chargers (up to 5,000 A per parking area); charging units in the technical corridor above the parking hall (450 kW fast-charging and 150 kW long-duration charging points); DC cabling on cable support systems to the pantographs for parking areas A to C; a 150 kW charging point in the workshop and a connection for a mobile charger; calibrated meters per charging point; and a standalone depot charge-management system integrated with building control and DSW21's IT systems. Testing and acceptance by experts, proof to the grid operator, commissioning, participation in trial operation, as-built documentation and operator training are also included. Interfaces: DSW21 will separately procure the shell of the transformer building and media tunnel (preliminary works, completion approx. May 2027). A separate general contractor for the buildings will prepare the structural and technical conditions for the charging infrastructure, and will also handle site logistics and overall site coordination. The charging-infrastructure general contractor must provide load, power and heat-dissipation data and cable lists, label its installations, handle internal equipotential bonding, coordinate installation planning with the building contractor (clash checks, loads, heat removal, fire and sound protection), work within defined installation windows, and take part in coordinated commissioning, including fire-case shutdown control of the charging infrastructure. The exact interface boundaries are set out in an interface list in the tender docum…

Key requirements

  • Turnkey 10 kV medium-voltage switchgear and seven 2,000 kVA transformers with handover to grid operator
  • Busbar systems up to 5,000 A and 450 kW fast / 150 kW slow charging points with pantographs for three bays
  • Planning, testing, commissioning, certification, and operator training for 24/7 bus depot

CPV codes

Relevant sectors

How this compares

About this sector

Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published23 Nov 2026
Closes21 Dec 2026, 00:00 UTC
Buyer typeUtility
TypeWorks
DeliveryOn-site
CountryGermany
RegionEurope
CurrencyEUR
Last verified24 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)