Skip to content
Raise Lens
Tender · Öffentliche Vergabe (Germany)

Turnkey construction (EPC) of a grid-connected battery storage system

Original: Schlüsselfertige Errichtung (EPC) eines netzgekoppelten Batteriespeichersystems

Energiespeicher Soltau I GmbH

Value
Not stated · check listing
Closes
14 Dec 2026
 
Where
Germany
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 27 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 17 Nov 202627 days to prepare
Found today · 24 Nov 202620 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Germany (Europe). It is classified under Energy Storage, Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

A turnkey EPC contract covering design, supply, construction and commissioning of a 10-12.5 MW grid-connected battery storage system, including a transfer transformer station. It suits experienced utility-scale EPC contractors with battery storage and high-voltage grid connection track records, not early-stage firms.

Summary by Raise Lens from the official notice · 20 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The tender is for the turnkey engineering, procurement and construction (EPC) of a grid-connected battery energy storage system, published by Energiespeicher Soltau I GmbH on the Deutsche eVergabe portal as an open procedure under the SektVo (Sektorenverordnung). The listing shows a publication date of 13.11.2026 and a submission deadline of 14.12.2026. The listing page does not disclose the technical specification, storage capacity, output, site location, deliverables, or expected contract duration. These details are presumably in the tender documents, which the portal states are downloadable as a ZIP container for registered companies. The page itself does not show the documents.

Key requirements

  • Turnkey EPC scope: project design, supply, construction and commissioning
  • Battery energy storage system of 10 to 12.5 MW grid-connected
  • Includes handover transformer substation (Übergabe-Trafostation)

CPV codes

Relevant sectors

How this compares

About this sector

Energy storage funding spans batteries, long-duration storage, thermal storage and the controls that dispatch them. Research calls focus on chemistry and system cost. Demonstration programmes test grid services, while tenders buy capacity, flexibility and installation contracts. Buyers usually want evidence of safety certification, round-trip efficiency and a credible route to grid connection.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceÖffentliche Vergabe (Germany)
Published15 Nov 2026
Closes14 Dec 2026, 00:00 UTC
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountryGermany
RegionEurope
SubmissionElectronic submission via the Deutsche eVergabe portal (open procedure under Sek
Last verified20 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)