This tender closed on 4 May 2026. The deadline passed 204 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
GPN - Egypt - Sustainability of the Abu Rawash Wastewater Treatment Plant through Sharbament Wastewater Treatment Plant project - WWTP
- Value
- Not stated · check listing
- Closes
- Closing date passed
- Where
- Egypt
- Contract
- Works · Multilateral
In context
This is a contract notice published by a multilateral institution covering construction and works. Delivery covers Egypt and Africa (MENA). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures design, construction, and/or operational support for wastewater treatment plant (WWTP) infrastructure in Egypt, specifically to sustain the Abu Rawash WWTP through the Sharbament WWTP project. Bidders should have expertise in wastewater treatment engineering, infrastructure delivery, and water/sanitation systems in developing-country contexts.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
This procurement relates to a General Procurement Notice (GPN) for the 'Sustainability of the Abu Rawash Wastewater Treatment Plant through Shabramant Wastewater Treatment Plant (SWWTP) Project' in Egypt, financed by a Grant from the African Development Bank (AfDB). The strategic objective is to finalize the strategic planning for the sustainability of the Abu Rawash Wastewater Treatment Plant (ARWWTP) complex and ensure the feasibility, soundness, sustainability, and cost-effectiveness of the Shabramant WWTP (SWWTP), which will accommodate future inflow from the ARWWTP complex. The Grant will finance the preparation of a technical feasibility study for the development of the Shabramant WWTP and its required lifting stations and pipelines. The scope includes data collection based on a recently updated master plan concerning the transfer of flow to Shabramant WWTP, a financial analysis report, and an economic feasibility report. Additionally, the assignment will support the preparation of detailed designs and bidding documents for wastewater facilities, lifting stations, and pipelines. This includes preparation of Environmental and Social Impact Assessment (ESIA) reports, a Climate Change Risks Assessment, GHG net emissions estimation, and a Gender Analysis.
Key requirements
- Wastewater treatment plant design, construction, and/or rehabilitation expertise
- Experience with WWTP infrastructure in Egypt or similar water-stressed developing regions
- Capacity to ensure long-term sustainability and operational viability of treatment systems
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)