Heating, Electrical, Mechanical and Decarbonisation Framework 2026 Tender

EASTERN PROCUREMENT LIMITED

In context

This is a contract notice published by a government body covering a mix of works, supplies and services. Bids are invited through a framework agreement. Delivery covers United Kingdom, Guernsey and Isle of Man and 1 other. It is classified under Heating and Cooling, Energy Efficiency and Renewable Energy and 2 others against the sustainability taxonomy rather than matched on keywords.

Summary

This framework procures heating, electrical, mechanical and decarbonisation works and services for domestic and non-domestic properties, including installation and maintenance of renewable and low-carbon energy systems such as heat pumps, solar thermal, biomass, and associated controls. Bidders must be multi-disciplinary heating, electrical and mechanical contractors with capacity to deliver planned and responsive maintenance, safety inspections, and emergency services across GB, GG, IM, and JE.

Summary by Raise Lens from the official notice · 27 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Eastern Procurement Limited is establishing a single, combined, multi-supplier Heating, Electrical, Mechanical and Decarbonisation Framework, not divided into lots. It covers works and associated services to domestic and non-domestic properties and buildings, including occupied and void properties. Scope includes the provision, supply, installation, replacement, upgrading, servicing, statutory and safety inspection, testing, planned and responsive maintenance, and repair of heating, electrical, mechanical, renewable, low-carbon and associated energy systems. Heating works cover gas, oil, solid fuel, electric and renewable or low-carbon systems, including boilers, heat pumps (air, ground and solar-assisted), biomass, CHP and micro-CHP, heat networks, solar thermal, wind turbines and emerging technologies, together with associated hot and cold water services, cylinders, flues, controls, radiators and water treatment. The framework includes annual heating safety checks, landlord safety and compliance work, planned and responsive repairs, breakdown and emergency attendance, including 24-hour, 365/366-day cover where required. Electrical works include rewiring, upgrading, testing, certification and EICRs, consumer units, RCBOs, RCDs, AFDDs, surge protection, main intake and DNO work, earthing and bonding, lighting, sockets, immersion heaters, electric showers, fire and carbon-monoxide alarm systems, and electric vehicle charging infrastructure that may be supplied and installed. Mechanical works include mechanical ventilation with heat recovery, thermostatic mixing valves and boosted cold-water pumps. Decarbonisation scope covers solar PV with batteries, monitoring and smart controls, and retrofit support services such as EPCs, SAP10 assessments, PAS 2035 services, air-pressure testing, retrofit design and coordination, Legionella risk assessments, and project management for grant-funded and larger retrofit programmes. Works will be delivered under the JCT MTC 2024 contract, with call-off orders placed by Clients using the framework's contract mechanisms. Suppliers must be able to deliver the full range of works and services, either directly or through their declared supply chain. The framework is intended to remain flexible to legislative, technical, funding and technology changes over its term. The stated framework duration is not given on the page.

Bidder eligibility

Bidder eligibility is governed by Volume 7 (Conditions of Participation) of the tender pack, which the notice states is set out in full in the procurement documents rather than on the page. Suppliers must be able to deliver the overall range of works and services in scope, directly or through their declared supply chain. Appendix B (Key Staff) and Appendix A (Certificate of Bona Fide Tender and Non-Canvassing Certificate) are also required. Specific financial thresholds, registrations, accreditations and references are not stated on the page.

How bids are scored

Bids are evaluated using Volume 5 (Pricing Introduction and Pricing Framework) and Volume 6 (Quality Evaluation), with Volume 8 (Key Performance Indicators) also in the pack. The price/quality split and weightings are not disclosed on the page.

Key requirements

  • ✓Supply, installation, replacement and upgrading of heating systems (gas, oil, electric, renewable and low-carbon technologies)
  • ✓Provision of heat pumps (air-source, ground-source, solar-assisted), biomass boilers, solar thermal, microgeneration and emerging renewable heating technologies
  • ✓Planned and responsive maintenance, statutory safety inspections, testing, servicing, breakdown services and 24/365 emergency attendance
  • ✓Associated hot-water systems, controls, smart thermostats, pipework, radiators, tanks, flues and water treatment services
  • ✓Landlord safety and compliance, void and mutual-exchange checks, thermostatic mixing valve and unvented cylinder servicing

About this sector

Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.