Skip to content
Raise Lens
Tender · TED (EU)Closed

HVAC system delivery, installation, commissioning, training and warranty support for Laboratory 1

Original: Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery – Доставка, монтаж, въвеждане в експлоатация, обучение за работа и гаранционна поддръжка на отоплителна, вентилационна и климатична инсталация (ОВКИ) за Лаборатория 1, част от Център за компетентност ХИТМОБИЛ

ИНСТИТУТ ПО ЕЛЕКТРОХИМИЯ И ЕНЕРГИЙНИ СИСТЕМИ

Value
Not stated · check listing
Closes
3 Jul 2026Closing date passed
Where
Bulgaria
Contract
Mixed · Government

In context

This is a contract notice published by a government body covering a mix of works, supplies and services. Bids are invited through an open procedure. Delivery covers Bulgaria (Europe). It is classified under Heating and Cooling, Energy Efficiency and Sustainable Buildings against the sustainability taxonomy rather than matched on keywords.

Summary

Procurement of a complete heating, ventilation, and air-conditioning (HVAC) system for a laboratory, including delivery, installation, commissioning, staff training, and 12-month warranty support. Suitable bidders are HVAC system integrators and mechanical engineering firms with installation and commissioning expertise.

Summary by Raise Lens from the official notice · 24 Jun 2026Accurate?

This tender has closed

Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.

About this tender

The subject of this public procurement is the delivery, installation, commissioning, operational training, and warranty maintenance of a Heating, Ventilation, and Air Conditioning (HVAC) installation (ОВКИ) for Laboratory 1, part of the HITMOBIL Competence Centre. The scope includes: (1) Delivery of equipment as described in Technical Specification – Annex No. 2 to the tender documentation; (2) Assembly/installation, commissioning, configuration, and testing of the delivered equipment; (3) Training of a minimum of 3 staff members designated by the contracting authority on the operation of the delivered equipment; (4) Warranty maintenance of the delivered equipment and supply of necessary parts, materials, and consumables throughout the warranty period (minimum 12 months from the date of installation, commissioning, configuration, and testing). Timelines: Equipment delivery shall be completed within 6 (six) months from contract signing. Installation, commissioning, configuration, and testing shall be completed within 30 (thirty) days from the delivery date confirmed by a Delivery Acceptance Protocol. Staff training shall be completed within 5 (five) days from the date of installation and commissioning confirmed by the relevant Protocol. The warranty period shall be a minimum of 12 (twelve) months from the date of installation and commissioning. The place of performance is Sofia 1113, 'Acad. G. Bonchev' Street, Block 10, Institute of Electrochemistry and Energy Systems 'Acad. Evgeni Budevski' – Bulgarian Academy of Sciences (IEES-BAS). The activities are financed under the Programme 'Scientific Research, Innovation and Digitalization for Smart Transformation' 2021–2027, co-financed by the European Union through the European Regional Development Fund, under project 'Development and Sustainability of the HITMOBIL Competence Centre', contract No. BG16RFPR002-1.014-0009.

Bidder eligibility

Not explicitly detailed in the provided text. The procedure is conducted under Bulgarian Public Procurement Act (ZOP), implying standard legal eligibility requirements apply (registration, absence of exclusion grounds, technical and financial capacity). Specific selection criteria are not disclosed in the extracted content.

How bids are scored

The evaluation of technical and price proposals will be conducted before the preliminary selection stage (so-called 'reversed order' procedure), pursuant to Article 104, paragraph 2 of the Bulgarian Public Procurement Act (ZOP), with the Commission's actions carried out in the sequence prescribed by Article 61 of the Regulations on ZOP (PPZOP). Specific weighting between price and quality is not disclosed in the extracted content.

Key requirements

  • Supply and deliver HVAC system per technical specification within 6 months
  • Installation, commissioning, testing and configuration within 30 days of delivery
  • Training of minimum 3 staff members within 5 days of commissioning
  • Minimum 12-month warranty with parts, materials and consumables supply

CPV codes

How this compares

About this sector

Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceTED (EU)
Published4 Jun 2026
Closes3 Jul 2026, 00:00 UTC
Buyer typeGovernment
TypeMixed
MethodOpen
DeliveryOn-site
CountryBulgaria
RegionEurope
CurrencyEUR
SubmissionElectronic procurement portal (TED/Bulgarian public procurement system), with re
Last verified24 Jun 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)