Installation of Individual Heat Substations and Energy Efficiency Improvement — Mykolaiv (Lot 1.1, Lot 1.2)
- Value
- Not stated · check listing
- Closes
- 14 Dec 2026
- Where
- Ukraine
- Contract
- Works · Multilateral
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a multilateral institution covering construction and works. Bids are invited through an open procedure. Delivery covers Ukraine (Europe). It is classified under Heating and Cooling, Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This NEFCO-managed, Danish-grant-funded tender procures installation of individual heat substations for a boiler-house heating district in Mykolaiv, Ukraine, split into Lots 1.1 and 1.2. It suits experienced heating-engineering contractors able to deliver on-site district-heating retrofit works, with SMEs able to bid per lot.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Regional Utility Company "Mykolaivoblteploenerho" (the Employer) invites tenders for contract(s) MYK_DH_1, "Installation of Individual Heat Substations and Energy Efficiency Improvement — Mykolaiv", in Ukraine. The works are split into two lots, both covering the installation of individual heat substations for the boiler house heating district at 71 Bila Street: Lot 1.1 (Part 1) and Lot 1.2 (Part 2). The project is financed by a grant from the Government of Denmark through the Danish Ministry of Foreign Affairs (DMFA), channelled via the Nordic Environment Finance Corporation (NEFCO) as manager of the NEFCO Green Recovery Fund for Ukraine, under the "Danish Support for Ukrainian Municipalities" programme. This invitation to tender follows NEFCO's General Procurement Notice dated 27.04.2026. The tender and resulting contract(s) are governed by NEFCO's Procurement Policy and Procedures. The page states that the tender notice was published on 13.11.2026 with a closing date of 14.12.2026. The expected contract duration is not stated on the page.
Lots
- Lot 1.1: Lot 1.1 - Installation of individual heat substations, Part 1
Installation of individual heat substations for the boiler house heating district located at 71 Bila Street (Part 1).
- Lot 1.2: Lot 1.2 - Installation of individual heat substations, Part 2
Installation of individual heat substations for the boiler house heating district located at 71 Bila Street (Part 2).
Key requirements
- Installation of individual heat substations for the 71 Bila Street boiler-house heating district (Lots 1.1 and 1.2)
- Electronic tender submission by 14 December 2026, under NEFCO procurement rules funded by Danish grant
- Works-contract delivery on site in Mykolaiv, Ukraine
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)