Ukraine: Construction of a new combined heat-and-power plant with up to 250MW of electrical output capacity, RLF - Ukrnafta II
- Value
- Not stated · check listing
- Closes
- 30 Nov 2026
- Where
- Ukraine
- Contract
- Works · Multilateral
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a multilateral institution covering construction and works. Delivery covers Ukraine (Europe). It is classified under Heating and Cooling and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures the construction of a new combined heat-and-power plant in Ukraine with up to 250MW of electrical capacity, apparently linked to Ukrnafta. It suits large engineering and construction contractors with power-plant delivery track records, not early-stage sustainability startups.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The procurement concerns the construction of a new combined heat-and-power (CHP) plant with up to 250MW of electrical output capacity in Ukraine, under the EBRD-financed RLF - Ukrnafta II project (EBRD Project ID 56077). The client is Ukrnafta PJSC. The notice is an Invitation for Prequalification under an open two-stage tender with prequalification (PQQ) for a works contract in the Power and Energy sector. The stated contract scope includes supply of Gas Insulated Switchgear, one SST 600 (66.7MW) steam turbine package, one two-winding power transformer (100MVA), and related services, along with protective structures for the CHP plant. The notice does not state the contract duration, start date, or deliverable timelines. These are said to be set out in the tender documentation, which is accessible only via the ECEPP portal after registration.
Bidder eligibility
Not stated on the public notice page. The notice says contracts are open to firms from any country unless the procurement documents specify otherwise, and that eligibility and qualification requirements are contained in the documentation available on ECEPP. Contracts are subject to the EBRD Procurement Policies and Rules.
How bids are scored
Not disclosed on the public notice. The notice refers to detailed technical and financial requirements in the procurement documentation. As a prequalification stage, the notice implies a shortlisting process before the main tender, but no scoring method, weightings, or price/quality split is given.
Key requirements
- Construction of a new CHP plant up to 250MW electrical output
- Large-scale power plant engineering and construction capability
- Ukraine site delivery under a multilateral financing facility (RLF)
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)