Invitation to tender for solar power plant project 2026
Original: Güneş enerji santrali projesi için ihaleye davet
YÜCEKAPI BELEDİYE BAŞKANLIĞI
In context
This is a contract notice published by a government body covering construction and works. Bids are invited through a direct award. Delivery covers Türkiye. It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.
A Turkish municipality is procuring construction works for a solar power plant project in Eleşkirt, Ağrı, under an exception-based procurement route. A local or regional construction contractor with solar PV installation experience would fit, though the thin description leaves the scope and value unclear.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Yücekapı Belediyesi (Yücekapı Municipality, Ağrı, Turkey) is tendering the design, supply and installation of a solar power plant (GES) in Yücekapı, Ağrı, under tender reference YUCEKAPI-PUMREP-W1. The project is part of the Public Renewable Energy Project (PUMREP) and is financed by a World Bank loan channelled through İLBANK. The procurement follows World Bank procurement rules and procedures. The page does not give the scope in detail, the contract duration, or the full list of deliverables. Those are said to be in the full tender document, which bidders can obtain from the municipality or from the websites of İLBANK, the municipality, and EKAP. Bid validity is 119 calendar days from the bid opening date of 13/11/2026. Bids must be accompanied by a temporary guarantee of USD 18,000 or an equivalent amount.
Key requirements
- ✓Construction works for a solar power plant (renewable-energy generation)
- ✓Located in Eleşkirt, Ağrı, Turkey
- ✓Procured under Turkish 'exceptions and out-of-scope' (İstisna ve Kapsam Dışı) route
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →