Manchester International Airport Phase 2 - Platform Civils 2026 Tender
Kier Transportation - CP7 NWC
- Value
- £2.5M
- Closes
- 4 Dec 2026
- Where
- United Kingdom
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 27 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Delivery covers United Kingdom. It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures platform civils works at Manchester Airport station, including demolition, drainage, riser walls, and foundations, to add platform capacity for longer double-stacked trains. It suits civil engineering contractors with rail-environment experience, and smaller civils firms could bid for or subcontract elements of the work.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The works comprise the construction and completion of the platform civils work at Manchester Airport Station. • Platform demolition • Asset recoveries • Track walkway/crossings • UTX • Troughing • Riser wall foundations • New riser walls (blockwork and PCC) • Copers (including realignment) • Tactile paving • Drainage (ACO's and carrier) • Ducting • Equipment foundations (in-situ and PCC) • Waiting shelter foundations • Platform furniture • SME works (end of platform ramps) • Fencing/Gate works • Block paving/surfacing • Associated reinstatement works
Key requirements
- Platform demolition, riser wall and foundation construction at Manchester Airport station
- Drainage, ducting, tactile paving and track walkway/crossing works
- Delivery within the Manchester and North West Transformation Programme (MNTP) Tranche 1 rail capacity scheme
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)