MF Energie: Smart Meter Rollout 2026 Tender
Murg Flums Energie
In context
This is a contract notice published by a government body covering the supply of goods. Bids are invited through an open procedure. Delivery covers Switzerland (Europe). It is classified under Grid Modernization and Energy Efficiency against the sustainability taxonomy rather than matched on keywords.
Murg Flums Energie is replacing approximately 3,200 existing electricity meters with smart meters across its distribution network, divided into multiple lots by postal code. Bidders should be smart meter manufacturers, installation contractors, or system integrators with experience in utility-scale meter rollout and grid modernization.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Murg Flums Energie (MFE) is rolling out smart meters to replace approximately 3,200 existing electricity meters in their own distribution network. The rollout is divided into multiple lots based on postal code (PLZ) areas for better operational management. Lot 1 covers postal code areas 8897 and 8898. Services include project management, administration, coordination and meetings with the client; scheduling and coordination of installation dates; meter handling and logistics; 1:1 replacement of direct-measuring meters; installation and commissioning of additional communication modules approved by MFE; complete documentation of the installation process via tablet on MFE's web-based application; removal and return of old devices; site documentation of distribution points and flexible resources (PV, heat pumps, e-mobility); and measurement and documentation of short-circuit currents. Contract duration is not specified.
Bidder eligibility
Criteria are specified in the tender documentation. Bidders must be registered users on simap.ch to access detailed documents. Bidding consortia, subcontractors, and multiple tenders from these entities are permitted.
How bids are scored
Award criteria are specified in the tender documentation (not detailed in the public notice).
Lots
- Lot 1: Rollout PLZ 8897 und 8898
Smart meter rollout for postal code areas 8897 and 8898, including project management, installation, documentation, meter handling and logistics, communication module installation, and site documentation.
Key requirements
- ✓Supply and installation of approximately 3,200 smart meters
- ✓Rollout organized by postal code zones (Lots 1–3 specified)
- ✓Compliance with Swiss utility distribution network standards
- ✓Quantities subject to final determination by MFE
Procurement contact
The notice names a procurement contact for clarification questions.
CPV codes
Relevant sectors
How this compares
- Compared with 52 similar tenders (grid mod in Switzerland) listed in the last 12 months.
- It allows 54 days to respond, longer than the typical 43 days across 42 similar tenders.
- This is the only similar tender from this organisation listed here in the last 12 months.
Closest open tenders
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Grid modernisation covers transmission, distribution, smart meters, interconnectors and the software that balances a network with more variable supply. Funding comes as innovation calls for network operators and suppliers as well as large public tenders for equipment and works. Applicants are usually asked to show technical readiness and experience working with regulated network companies.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →