Miscellaneous special-trade construction work – HA_NDO_202680 MODERNISATION PASSE A POISSONS - MEYMES - VANTELLERIE
SOCIETE HYDRO-ELECTRIQUE DU MIDI
- Value
- Not stated · check listing
- Closes
- 30 Dec 2026
- Where
- France
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers France (Europe). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This French tender procures the modernisation of sluice gates, stoplogs (bartardeaux), gratings and handrails at a hydroelectric plant's upstream and downstream channels, including design calculations, fabrication, factory acceptance testing, asbestos and lead-contaminated equipment removal, and waste disposal. It suits an industrial contractor with hydraulic gate fabrication, heavy lifting and hazardous-materials capability rather than a small early-stage firm.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The contract covers modernisation works on a fish pass (passe à poissons) at the Meymes – Vantellerie site, under the reference HA_NDO_202680, procured by Société Hydro-Électrique du Midi. The works are organised in two phases, preceded by a set of upstream design and fabrication tasks. Upstream tasks: size the gates and stoplog (batardeau) according to the technical specification (CCTP); manufacture the gates and stoplogs; host a Factory Acceptance Test (FAT) for the gates; calculate the loads imposed by the gates and the grating (caillebotis); and calculate the maximum safe working load (CMU) for a jib crane (potence) suited to the existing structure. Phase 1, upstream channel: install a new stoplog; open the existing grating; install a new downstream gate; and supply all lifting equipment and access means needed for the works. Phase 2, downstream channel: dismantle the existing gates (asbestos and lead are present) and the existing gratings and handrails; install a new upstream gate, new gratings and new handrails; optionally install a jib crane; dispose of all dismantled equipment through approved waste channels; and supply all lifting equipment and access means needed for the works. The page does not state the expected duration of the works.
Key requirements
- Design and calculation of new gates, stoplogs and grating loads per CCTP criteria, with fabrication and factory acceptance test (FAT)
- Two-phase onsite installation on upstream and downstream channels, including removal of asbestos- and lead-contaminated equipment
- Provision of all lifting, handling and access equipment, plus certified disposal of dismantled materials at approved facilities
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)