Skip to content
Raise Lens
Tender · CanadaBuysClosed

Mission Hill Water Treatment Plant 2026 Tender

Original: Mission Hill Water Treatment Plant - Construction Management Process

Regional District of North Okanagan

Value
Not stated · check listing
Closes
28 Jul 2026Closing date passed
Where
Canada
Contract
Services · Government

In context

This is a contract notice published by a government body covering services. Bids are invited through an open procedure. Delivery covers Canada (NORTH-AMERICA). It is classified under Water against the sustainability taxonomy rather than matched on keywords.

Summary

The Regional District of North Okanagan seeks a Construction Manager for pre-construction and construction services on a new water treatment plant under a CCDC 5B contract framework. Qualified construction management firms with water infrastructure and collaborative project delivery experience are the target bidders.

Summary by Raise Lens from the official notice · 4 Jul 2026Accurate?

This tender has closed

Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.

About this tender

The Regional District of North Okanagan (RDNO) is requesting proposals from qualified firms to provide Pre-Construction and Construction Services for the new Mission Hill Water Treatment Plant (MHWTP). Services will be delivered under a Construction Management Contract – for Services and Work (CCDC 5B), utilizing a single integrated framework governing the full project lifecycle across two distinct phases. Phase 1 (Pre-Construction Services) is activated immediately upon contract award and is governed by the CCDC 5B Construction Management Contract Framework (Appendix A), as amended by the Supplementary General Conditions (Appendix B). The primary objective of Phase 1 is the collaborative, open-book development and transparent pricing of a mutually acceptable Stipulated Price for the construction works. The RDNO has separately contracted design services with a Consultant, and the successful Construction Manager will work collaboratively with both the Consultant and RDNO throughout. Phase 2 (Construction Services) is conditional upon successful conclusion of Phase 1 and mutual acceptance of the Stipulated Price. Upon exercise of the built-in CCDC 5B Stipulated Price Option, the project transitions into active construction with payment mechanisms governed by the CCDC 5B contract, Supplementary General Conditions, Technical Specifications, and Project Drawings. The RDNO is under no obligation to proceed to Phase 2 and reserves the right to terminate the agreement at the end of Phase 1 via GC 7.1 if a mutually agreeable Stipulated Price cannot be negotiated. The contract duration is not explicitly specified but spans at minimum Phase 1 pre-construction services, with Phase 2 construction services contingent on negotiation outcomes. A non-mandatory site visit has been provisioned for Wednesday, July 8, 2026 at 1:30 PM local time.

Bidder eligibility

Proposals should be submitted by firms with a capable and demonstrable background in the type of work described (construction management for water or wastewater treatment plants or similar public works). All interested firms must have sufficient, readily available resources including trained personnel, support services, specialized consultants, and financial resources to carry out the work without delay or shortcomings. Services must be performed under the responsible charge of a Project Manager qualified and experienced in public works construction, preferably with experience in water or wastewater treatment plants.

How bids are scored

Evaluation criteria are not explicitly disclosed in the notice. The tender is a Request for Proposals (RFP) process. Proposals are to be assessed on the firm's demonstrable background and capability in relevant construction management work, available resources, and the qualifications of the proposed Project Manager. No price/quality weighting split is disclosed in the available text.

Key requirements

  • Phase 1 pre-construction services including collaborative development of stipulated pricing
  • Phase 2 construction management under CCDC 5B Stipulated Price framework
  • Collaboration with separate design consultant and RDNO throughout project lifecycle
  • Open-book pricing and transparent cost management during pre-construction phase
  • Compliance with CCDC 5B contract terms, supplementary conditions, technical specifications and project drawings

Procurement contact

The notice names a procurement contact for clarification questions.

Relevant sectors

How this compares

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceCanadaBuys
Published30 Jun 2026
Closes28 Jul 2026, 07:00 UTC
Buyer typeGovernment
TypeServices
MethodOpen
DeliveryOn-site
CountryCanada
RegionNORTH-AMERICA
SubmissionProposals submitted via third-party site (BC Bid portal at bcbid.gov.bc.ca); wri
Last verified4 Jul 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)