This tender closed on 10 September 2026. The deadline passed 76 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
National Hydrogen Innovation Technology Centre – Structural Design Planning
Original: Nationales Innovations- und Technologiezentrum Wasserstoff (ITZ Süd) - Tragwerksplanung
HyTACC GmbH
- Value
- Not stated · check listing
- Closes
- 10 Sep 2026Closing date passed
- Where
- Germany
- Contract
- Services · Government
In context
This is a contract notice published by a government body covering services. Bids are invited through an open procedure. Delivery covers Germany (Europe). It is classified under Hydrogen and e-Fuels and Sustainable Buildings against the sustainability taxonomy rather than matched on keywords.
Summary
Structural engineering design services for a hydrogen research and testing facility in Germany, including phased planning from concept through detailed design. Bidders must be qualified structural engineers or engineering firms capable of delivering HOAI-compliant design phases for industrial/research infrastructure.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Der Auftraggeber beabsichtigt die Realisierung einer Forschungs-, Test- und Entwicklungsinfrastruktur für Wasserstoffanwendungen am Standort Pfeffenhausen. Das Vorhaben ist Teil des Nationalen Innovations- und Technologiezentrums Wasserstoff (ITZ) und dient dem Technologietransfer von Forschung in industrielle Anwendungen sowie der Bereitstellung von Test-, Prüf- und Entwicklungsinfrastruktur für wirtschaftliche und nichtwirtschaftliche Nutzer. Gegenstand dieser Ausschreibung sind die stufenweise Beauftragung von Planungsleistungen für die Tragwerksplanung für den Neubau einer Wasserstofftesthalle mit Nebengebäude, Außentestflächen und Außenanlagen (§§ 51 ff. HOAI iVm Anlage 14.1). Die Aufteilung der einzeln abrufbaren Leistungsstufen gliedern sich in Stufe 1= Leistungsphasen 1 bis 3, Stufe 2 = Leistungsphase 4, Stufe 3 = Leistungsphase 5, Stufe 4 = Leistungsphasen 6. Zunächst wird nur die Stufe 1 beauftragt, es besteht kein Anspruch auf die Beauftragung der Folgestufen.
Key requirements
- Structural engineering design (Tragwerksplanung) per HOAI §51 ff., Annex 14.1
- Phased delivery: Stage 1 covers HOAI phases 1–3 (preliminary/concept design); stages 2–4 optional
- Design for hydrogen test hall, ancillary buildings, outdoor test areas, and site infrastructure at Pfeffenhausen
- Compliance with German building codes and hydrogen-safety standards
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Hydrogen and e-fuels funding supports electrolysers, production plants, storage, transport and end uses in industry, shipping and aviation. Support is often tied to low-carbon production standards and offtake from named users. Calls commonly ask for a site, a supply of renewable power and a consortium that covers production through to demand.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)