Pomeranian Metropolitan Railway Phase II: Gdańsk Śródmieście–Kowale line design-build
Original: Construction work for railways and cable transport systems – Realizacja zadania pn."Pomorska Kolej Metropolitalna Etap II: budowa linii kolejowej na odcinku Gdańsk Śródmieście – węzeł Kowale” w formule zaprojektuj i wybuduj.
Pomorska Kolej Metropolitalna S.A.
- Value
- Not stated · check listing
- Closes
- 30 Nov 2026
- Where
- Poland
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Poland (Europe). It is classified under Sustainable Buildings, Heating and Cooling and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Design-and-build contract for a new railway line extension (km ~-1+180 to ~-8+480) between Gdańsk Śródmieście and the Kowale junction, covering detailed design, construction, systems integration, commissioning, and warranty. It suits large rail construction contractors with metro/rail track record and consortium capacity rather than small sustainability firms.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The contracting authority, Pomorska Kolej Metropolitalna S.A., is procuring the design-and-build construction of Stage II of the Pomeranian Metropolitan Railway (Pomorska Kolej Metropolitalna). The works cover a new railway line between Gdańsk Śródmieście and the Kowale junction (węzeł Kowale), running from approximately km -1+180 to km -8+480, as an extension of line no. 250. The scope includes: preparing complete multi-discipline execution design based on the building design and building permit, which the buyer will provide with the final tender documentation (SWZ); preparing technical specifications for execution and acceptance of all works; preparing bills of quantities; carrying out the works in line with the building design, permit, execution designs, technical specifications and the employer's requirements; supplying, installing, configuring, integrating and commissioning equipment, systems and software; performing required tests, trials and acceptances; and handing over the railway infrastructure with its technical and road infrastructure, engineering structures, technical systems and equipment for operation. The contractor must also prepare as-built documentation, meet conformity assessment and EC verification and certification obligations, obtain the permits, decisions, approvals and authorisations needed to bring the investment into use, deliver required training, and honour the warranty obligations. The expected contract duration is not stated on the page provided.
Key requirements
- Design-build delivery: complete multidisciplinary executive design based on the existing building permit and design
- Full construction, systems supply and integration, testing, commissioning and handover of railway infrastructure
- Obtain certifications, permits and approvals needed for putting the railway into service, plus warranty and training obligations
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)