Preliminary design studies for BOULAOUANE and RIBAT EL KHEIR pumped-storage plants 2026 Tender

Original: La réalisation des études d’Avant-Projet Sommaire (APS) des Stations de Transfert d’Énergie par Pompage (STEP) BOULAOUANE et RIBAT EL KHEIR.

OFFICE NATIONALE DE L'ELECTRICITE ET DE L'EAU POTABLE - BRANCHE ELECTRICITE

In context

This is a contract notice published by a government body covering consulting. Bids are invited through an open procedure. Delivery covers Morocco (MENA). It is classified under Energy Storage, Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

ONEE is procuring preliminary design studies (APS) for the Boulaouane and Ribat El Kheir pumped-storage hydro plants in Morocco, through an open tender. It suits engineering consultancies with hydropower or pumped-storage design experience, either directly or in partnership.

Summary by Raise Lens from the official notice · 28 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

La réalisation des études d’Avant-Projet Sommaire (APS) des Stations de Transfert d’Énergie par Pompage (STEP) BOULAOUANE et RIBAT EL KHEIR. Procédure : Appel d'offres ouvert Lieu d'exécution : SEFROU CHICHAOUA Référence : SP4130586

Key requirements

  • ✓Preliminary design (APS) studies for two pumped-storage hydro plants (STEP)
  • ✓Open tender procedure, reference SP4130586, location Sefrou Chichaoua, Morocco
  • ✓Engineering consultancy with hydropower or pumped-storage study experience

Relevant sectors

About this sector

Energy storage funding spans batteries, long-duration storage, thermal storage and the controls that dispatch them. Research calls focus on chemistry and system cost. Demonstration programmes test grid services, while tenders buy capacity, flexibility and installation contracts. Buyers usually want evidence of safety certification, round-trip efficiency and a credible route to grid connection.