This tender closed on 20 November 2026. The deadline passed 5 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Proposed 50kw Hybrid 57.2kwh Lithium Bank Three Phase Two Way Solar Plant 25kw Input
kapcherop technical and vocational college
- Value
- Not stated · check listing
- Closes
- 20 Nov 2026Closing date passed
- Where
- Kenya
- Contract
- Mixed · Government
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Kenya (Africa). It is classified under Renewable Energy and Energy Storage against the sustainability taxonomy rather than matched on keywords.
Summary
Kapcherop Technical and Vocational College in Kenya is procuring a 50kW hybrid solar plant with a 57.2kWh lithium battery bank, three-phase two-way, with 25kW input. It suits solar installers and renewable energy integrators able to supply and commission off-grid or hybrid PV-battery systems in Kenya.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
The works include a 57.2kWh lithium battery bank and a three-phase, two-way inverter system with 25kW input, to be supplied, installed and commissioned at the college premises in Kenya. The procurement is a mixed-type contract run as an open tender for the 2026/2027 financial year. No tender fee applies, bids remain valid for 14 days, and there is no preference or reservation scheme. Bids are submitted electronically. The tender was published on 6 November 2026 and closes on 20 November 2026 at 11:00 UTC.
Full description from the source
Kapcherop Technical and Vocational College (Kenya), through tender KTVC/PROC/01/2026/2027, is procuring a proposed 50kW hybrid solar power plant with 57.2kWh lithium battery bank, three-phase two-way inverter system, and 25kW input. The tender is classed as a Works procurement under an Open Tender method, for the 2026/2027 financial year. The page text does not describe deliverables, installation scope, duration, or technical specifications. These are presumably set out in the tender document attached to the notice (file 1793973616245-PROPOSED 50KW HYBRID 57.2KWH LITHIUM BANK THREE PHASE TWO WAY SOLAR PLANT 25KW INPUT, uploaded 6 November 2026), which was not included in the page content provided.
Key requirements
- Supply and install a 50kW hybrid solar plant
- Include 57.2kWh lithium battery bank with three-phase two-way inverter (25kW input)
- Installation and commissioning at the college premises in Kenya
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)