Railway track renewal Mužla–Gbelce, tracks 1-2 and Gbelce switches
Original: Railway construction works – Obnova koľaje ŽST Mužla - ŽST Gbelce, k. č. 1, 2 a výhybiek v ŽST Gbelce č. 1-6, 13, 14, 17-20
Železnice Slovenskej republiky
- Value
- Not stated · check listing
- Closes
- 15 Dec 2026
- Where
- Slovakia
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Slovakia and the European Union (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Slovak state railway operator tender for renewing a 6.5 km double-track electrified line and several switches at Gbelce station, including rail, sleeper, ballast and drainage works. Suited to established rail construction contractors with track-works certification, not early-stage sustainability firms.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The buyer, Železnice Slovenskej republiky, is procuring railway construction works titled "Obnova koľaje ŽST Mužla - ŽST Gbelce, k. č. 1, 2 a výhybiek v ŽST Gbelce č. 1-6, 13, 14, 17-20" (track renewal between Mužla and Gbelce stations and turnout renewal at Gbelce station). The scope covers renewal of the railway superstructure on the double-track electrified line between ŽST Mužla and ŽST Gbelce: track 1 for about 6,588 m and track 2 for about 6,502 m. It includes replacement of rails, sleepers and fastenings, full-profile cleaning or excavation of the track bed, and topping up of ballast. It also covers replacement of level crossing structures, and repair of railway substructure works, including unpaved drainage ditches, culvert cleaning and repairs to a bridge structure. Track equipment on tracks 1 and 2 will be replaced. At ŽST Gbelce, the works include renewal of tracks 1 (881 m) and 2 (935 m), renewal of turnouts 1-6, 13, 14 and 17-20 including intermediate sections, repair of a level crossing, and repair of platforms 1 and 2. Repair or replacement of OZT (signalling and telecommunications) equipment is included across the section, and removal of invasive vegetation that threatens railway safety is also in scope. Detailed specifications are set out in the tender documents. The expected contract duration is not stated on the page.
Key requirements
- Renewal of track superstructure: rail, sleeper, fastener replacement and full-profile ballast cleaning on tracks 1 and 2 (6,588 m and 6,502 m)
- Renewal of switches 1-6, 13, 14, 17-20 at Gbelce station, platforms 1 and 2, and level crossing repair
- Drainage, culvert cleaning, bridge repair and removal of invasive vegetation, with railway OZT equipment works
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)