Railway reconstruction and electrification Devínska Nová Ves–Austrian border
Original: Railway construction works – Komplexná rekonštrukcia a elektrifikácia trate Devínska Nová Ves – št. hranica (Marchegg)
Železnice Slovenskej republiky
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- Slovakia
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Slovakia, Austria and the European Union (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Complex reconstruction and electrification of a single-track railway line between Devínska Nová Ves and the Austrian border (Marchegg), including bridge reconstruction and pre-electrification works. Bidders must be large construction/rail infrastructure contractors capable of delivering integrated railway electrification and civil works on a cross-border EU corridor.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Complex reconstruction and electrification of the single-track railway line Devínska Nová Ves – state border (Marchegg), located between Bratislava and Vienna (track section TÚ 2805, km 37.910 to km 39.105). The project comprises two construction works: (A) electrification of the railway line with pre-electrification modifications, and (B) complex reconstruction of a bridge structure. The objective is to improve cross-border passenger and freight transport between Slovakia and Austria, increase operational speed, reduce travel time, enhance track parameters, increase service frequency based on improved capacity, remove transport restrictions on the railway bridge, and reduce CO2 emissions and noise through railway electrification. The contractor must ensure all project elements are compatible and delivered as a single functional unit.
Lots
- Lot A: ŽSR, Devínska Nová Ves - Marchegg, elektrifikácia trate
Electrification of the railway line with pre-electrification modifications
- Lot B: Komplexná rekonštrukcia mostného objektu v žkm 37,910 trate št. hr. (Marchegg) - Devínska Nová Ves, TÚ 2805, DÚ 02, št. hr. OBB Devínska Nová Ves
Complex reconstruction of bridge structure at km 37.910
Key requirements
- Electrification of single-track railway line (TÚ 2805) between Bratislava–Vienna corridor, km 37.910–39.105
- Complex track reconstruction and bridge reconstruction (two structures: electrification works + bridge object rebuild)
- Pre-electrification modifications and full integration as single functional unit upon handover
- Cross-border compatibility and operational speed/capacity improvements; CO₂ and noise reduction via electric traction
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)