Skip to content
Raise Lens
TENDER · spain-pcsp-regionalgovernmentservices

Sale of Final Energy Savings from Efficiency Works, Vitoria-Gasteiz and Zamudio-Derio 2026 Tender

Original: Enajenación onerosa del ahorro de energía final generado en las actuaciones de eficiencia energética realizadas en los campus de Vitoria-Gasteiz y Zamudio-Derio del Parque Tecnológico de Euskadi

Parque Tecnológico de Álava, S.A.-Dirección General

In context

This is a contract notice published by a government body covering services. Delivery covers Spain and the European Union (Europe). It is classified under Energy Efficiency and Sustainable Buildings against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures the sale of energy savings generated from energy-efficiency retrofit projects at two technology park campuses in Spain's Basque Country. Bidders should be energy-service companies, ESCOs, or sustainability consultants capable of quantifying and monetizing verified energy-efficiency gains.

Summary by Raise Lens from the official notice · 18 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Parque Tecnológico de Álava, S.A. is procuring the onerous disposal (sale) of the final energy savings generated by energy efficiency actions carried out on the Vitoria-Gasteiz and Zamudio-Derio campuses of the Parque Tecnológico de Euskadi. The contract is classified under CPV 71314000-2 (energy services and related services) and the tender is run as a sale rather than a service purchase, with the buyer receiving payment for the energy savings. The tender notice states an expected annual saving of 389,696 MWh. The minimum price for the complete contract is 44,815.04 EUR (excluding VAT), and offers must not fall below 115 EUR/MWh (excluding VAT). The attached technical annexes reference an industrial decarbonisation project (Anexo I, Proyecto descarbonización E8), a technical energy record (Anexo II, Ficha TER173), a public lighting project in Zamudio (Anexo III), and a further technical record (Anexo IV, Ficha TER180). The contract duration is 10 weeks, with no extension options. Variants and options are not accepted, and the contract is not divided into lots. The bid validity period is 2 months from the submission deadline.

Bidder eligibility

Economic and financial solvency criteria and technical solvency criteria are stated to be set out in the tender specifications (PCAP and technical specifications), but the specific thresholds are not disclosed on the notice page. The contract is not subject to harmonised regulation (not covered by the GPA/ACP), is not a framework agreement or dynamic purchasing system, and is not reserved to a specific profession or to sheltered workshops. The contract is governed by Spanish Law 9/2017 (LCSP). Bidders should consult the PCAP and the technical specification document for the detailed requirements.

How bids are scored

The award criterion is best price ("Mejor precio"). No quality, technical or other weighted criteria are disclosed on the notice page, so the price/quality split is not applicable as stated. No electronic auction will be used. Offers must not be below 115 EUR/MWh excluding VAT. Social and other special clauses are flagged in the notice, but no specific weightings are shown.

Key requirements

  • ✓Quantification and verification of energy savings from completed efficiency retrofits
  • ✓Monetization and sale of verified energy-efficiency gains (white certificates or similar)
  • ✓Compliance with Spanish and EU energy-efficiency regulations and accounting standards

Procurement contact

The notice names a procurement contact for clarification questions.

CPV codes

How this compares

  • Compared with 503 similar tenders (efficiency in Spain) listed in the last 12 months.
  • Similar tenders that state a value range from $6k to $196m, with a median of $170k (410 tenders).
  • It allows 12 days to respond, shorter than the typical 17 days across 436 similar tenders.
  • This is the only similar tender from this organisation listed here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.