School buildings energy efficiency and consolidation works, Buzau, three lots
Original: Construction work for school buildings – Proiectarea și execuția lucrărilor de creștere a eficienței energetice și de consolidare pentru obiectivul de investiții „Implementarea conceptului de economie circulară și eficiență energetică în școlile gimnaziale din Municipiul Buzău” — trei loturi
MUNICIPIUL BUZAU
- Value
- Not stated · check listing
- Closes
- 22 Dec 2026
- Where
- Romania
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 28 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Romania (Europe). It is classified under Heating and Cooling, Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The Buzau municipality is procuring design and construction works to improve energy efficiency and seismically strengthen three lots of gymnasium schools, starting with School No. 5, a 1852 brick building. Bidders suited to this are construction contractors with experience in heritage seismic retrofit and building energy-renovation works.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The notice concerns the design and execution of energy-efficiency and structural consolidation works for school buildings under the investment objective "Implementarea conceptului de economie circulară și eficiență energetică în școlile gimnaziale din Municipiul Buzău". The procurement is divided into three lots, per the title. The page content provided covers only Lot 1. Lot 1 concerns School No. 5 "Episcop Dionisie Romano". The building dates from 1852 and has a load-bearing brick masonry structure, timber floor slabs and a timber roof truss with roof covering. It is P+1E, has a developed area of 1,814 m², and is classified in seismic risk class Rs II. The works must therefore combine structural consolidation with energy rehabilitation, carried out concurrently. The age of the building calls for particular care in designing the interventions, given the construction practices of the period and the current condition of the structural elements. The page does not state the contract duration, the detailed deliverables, or the scope of Lots 2 and 3. Clarification mechanics are stated: bidders may request clarifications up to 18 days before the bid deadline, and the contracting authority will answer at least 11 days before the deadline.
Lots
- Lot 1: Școala nr. 5 – Episcop Dionisie Romano
Design and execution of energy-efficiency and structural consolidation works on the 1852 brick-masonry school building (P+1E, 1,814 m², seismic risk class Rs II), with concurrent structural consolidation and energy rehabilitation.
Key requirements
- Design and execution of energy efficiency and structural consolidation works across three lots
- Seismic risk class Rs II requires concurrent structural strengthening and energy renovation of a 1,814 sqm building
- Heritage-sensitive intervention on a 170+ year old masonry structure with timber floors and roof
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)