Solar photovoltaic modules – installation of solar power plant at Delta car park
Original: Solar photovoltaic modules – Ugradnja solarne elektrane na parkiralištu Delta
Lučka uprava Rijeka
- Value
- Not stated · check listing
- Closes
- 1 Dec 2026
- Where
- Croatia
- Contract
- Mixed · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Croatia (Europe). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The Rijeka Port Authority is procuring supply, installation and commissioning of a rooftop solar photovoltaic plant on the Srednja Delta car park canopies, including inverters, electrical distribution, mounting structures and a concrete base with protective fencing. It suits established electrical and solar installation contractors able to deliver a mixed goods-and-works contract in Croatia.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
A Croatian buyer, a government body, is procuring a rooftop solar photovoltaic plant to be installed on the canopies of the Srednja Delta car park in Rijeka. The mixed contract covers the supply of PV modules, inverters, DC and AC distribution and metering equipment, along with mounting substructure and related accessories. The contract is geographically limited to Croatia and is classified under the CPV code 09331200. Work is delivered on site. The tender was published on 23 November 2026 and closes on 1 December 2026.
Full description from the source
The Lučka uprava Rijeka (Port Authority of Rijeka) is procuring a mixed supply contract for goods with ancillary works and services, where the dominant part is the supply and installation of equipment for a photovoltaic power plant on the carport canopies of the Srednja Delta parking area in Rijeka (cadastral plot 4645/1, k.o. Stari Grad). The scope covers photovoltaic modules, inverters, DC and AC distribution, the RO-FN distribution cabinet, equipment for electricity connection and metering, equipotential bonding and surge protection, mounting substructure, and all other necessary equipment, materials and accessories. Ancillary works include assembly, installation, connection, testing and commissioning of the plant, civil works to build a raised reinforced-concrete foundation slab with protective fencing for equipment, and inspection and remediation of the existing steel canopy structures before mounting. The work must follow the main design and applicable regulations. The notice states that solar PV is a zero net-emission technology under Article 4(1) of Regulation (EU) 2024/1735, so the requirements of Article 25 of that Regulation apply to the solar PV technology within the contract. Contract duration is not stated.
Key requirements
- Supply and installation of PV modules, inverters, DC/AC distribution and metering equipment
- Civil works: elevated reinforced concrete base slab with protective fencing, and inspection and repair of existing steel canopy structures
- Commissioning, testing and grid connection in line with main project and EU Regulation 2024/1735 Article 25 requirements
CPV codes
CPV codes
Relevant sectors
How this compares
How this compares
- Compared with 51 similar tenders (renewables in Croatia) listed in the last 12 months.
- Similar tenders that state a value range from $306k to $19m, with a median of $3.6m (6 tenders).
- It allows 8 days to respond, shorter than the typical 21 days across 31 similar tenders.
- The same organisation listed 1 other similar tender here in the last 12 months.
Closest open tenders
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts