This tender closed on 23 November 2026. The deadline passed 2 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Solar photovoltaic modules – installation of solar power plant at Delta car park
Original: Solar photovoltaic modules – Ugradnja solarne elektrane na parkiralištu Delta
Lučka uprava Rijeka
- Value
- Not stated · check listing
- Closes
- 23 Nov 2026Closing date passed
- Where
- Croatia
- Contract
- Mixed · Government
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Croatia (Europe). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Procurement of supply, installation and commissioning of a rooftop-style solar PV plant on the Delta car park canopies in Rijeka, including inverters, DC/AC distribution, mounting structures and a raised concrete base with fencing. Suited to electrical contractors and solar EPC firms able to deliver a mixed supply-and-works contract.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Supply, installation and commissioning of a rooftop-style solar PV array mounted on the canopies of the Delta car park in Rijeka is the subject of this contract, which mixes goods with associated works and services. The package covers panels, inverters, direct- and alternating-current distribution, metering and connection equipment, surge and equipotential protection, and mounting frames. Installation works include fitting, wiring, testing and switch-on, alongside a raised reinforced concrete base with protective fencing for the housing unit and a structural check and repair of the existing steel canopies beforehand. Bidders should be electrical contractors or solar engineering, procurement and construction firms able to deliver a combined supply and works package. The Article 25 requirements of the Net-Zero Industry Act apply to the solar technology in scope. The buyer is a Croatian government body. The contract is listed under CPV code 09331200, and the notice was published on 4 November 2026 with bids closing on 23 November 2026.
Full description from the source
The contract is a mixed procurement of goods with associated works and services, where the dominant part is the supply and installation of equipment for a photovoltaic power plant on the canopies of the Srednja Delta car park in Rijeka (cadastral plot 4645/1, k.o. Stari Grad). The buyer is Lučka uprava Rijeka (Port Authority of Rijeka). The scope covers PV modules, inverters, DC and AC distribution, the RO-FN distribution cabinet, equipment for electricity connection and metering, equipment for potential equalisation and surge protection, mounting substructure, and all other necessary equipment, materials and accessories. Ancillary works include mounting, installation, connection, testing and commissioning of the plant. Civil works include a raised reinforced-concrete foundation slab with protective fencing for equipment housing, and inspection and remediation of the existing steel canopy structure before installation. All other activities needed for functional and safe operation, in line with the main design and applicable regulations, are also included. The procurement applies the requirements of Article 25 of Regulation (EU) 2024/1735 (Net-Zero Industry Act) to the solar PV technology within its scope, as solar PV is a net-zero technology under Article 4(1). The expected contract duration is not stated in the excerpt.
How bids are scored
Not disclosed in the provided text. The notice states that Article 25 of Regulation (EU) 2024/1735 applies to the solar PV technology in scope. That article concerns the treatment of net-zero technologies in public procurement, which may affect award criteria, but no price/quality split or weightings are given in the excerpt.
Key requirements
- Supply of PV modules, inverters, DC/AC distribution and metering equipment
- Installation, testing and commissioning of the plant on existing canopies at Srednja Delta, Rijeka
- Civil works for raised reinforced concrete base and protective fencing, plus structural inspection of steel canopies
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)