Electrical installation photovoltaic system kindergarten Sandersdorf-Brehna
Original: Electrical installation work of electrical distribution apparatus – Neubau einer Kindertagesstätte im Stadtgebiet Sandersdorf-Brehna, OT Roitzsch / Los 41 Errichtung einer Photovoltaikanlage
Stadt Sandersdorf-Brehna
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- Germany
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Germany and the European Union (Europe). It is classified under Renewable Energy and Energy Storage against the sustainability taxonomy rather than matched on keywords.
Summary
Procurement for installation of a 66-module photovoltaic system with 44 kWh battery storage and lightning protection on a new kindergarten building in Germany. Bidders must have expertise in solar PV installation, electrical distribution, energy storage systems, and integration with lightning protection infrastructure.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Installation of photovoltaic system (Lot 41) as part of the construction of a new kindergarten facility in Sandersdorf-Brehna, district Roitzsch. The scope includes erection of PV installation with inverter and battery storage system. The building is single-storey. The PV system consists of approximately 66 PV modules (minimum 470 Wp each) and a storage system with minimum capacity of 44 kWh. The PV installation must be switchable via fire service switch (DC isolation). Mounting is on a flat roof with plastic sheeting and roof insulation via ballasting using paving slabs/concrete blocks. The PV installation is executed in three module fields (30 modules / 30 modules / 6 modules). The structure includes lightning protection system Class III. The PV installation must be integrated into the lightning protection system and designed for lightning current carrying capacity.
Key requirements
- Installation of approximately 66 PV modules (≥470 Wp each) on flat roof with ballast mounting
- 44 kWh battery storage system integration and commissioning
- DC isolation via firefighter switch and Class III lightning protection system integration
- Three-field module configuration (30/30/6 modules) with lightning-current-carrying capacity
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)