Skip to content
Raise Lens
Tender · simap.ch (Switzerland)

STEP Thurau skip loading station, including skips and guide rails

Original: STEP Thurau, station de chargement de bennes, y compris les bennes et les rails de guidage

Abwasserverband Thurau

Value
Not stated · check listing
Closes
29 Jan 2027
 
Where
Switzerland
Contract
Mixed · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 76 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 14 Nov 202676 days to prepare
Found today · 24 Nov 202666 days to prepare

In context

This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Switzerland (CH-SG). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

This Swiss tender procures design, manufacture, delivery, installation and commissioning of sludge conveying and skip-loading equipment for the west stage of the new Thurau wastewater treatment plant. It suits mechanical engineering firms and specialist equipment manufacturers able to supply wastewater sludge handling systems, including covers with extraction ventilation and pneumatic tipping devices.

Summary by Raise Lens from the official notice · 21 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

A Swiss government buyer is procuring the design, manufacture, delivery, installation and commissioning of sludge conveying and skip-loading equipment for the western stage of a new wastewater treatment plant, designed to serve around 130,000 people. The package centres on a main screw conveyor fed from the centrifugal decanter, distribution screws that fill the skips, pneumatic shut-off closures, ventilated covers with integrated through-draft extraction, pneumatically operated skip tipping devices and floor-mounted guide rails. The skips themselves form part of the scope. Required work covers full process engineering and dimensioning, factory fabrication, transport to the site, ready-to-run installation, anti-corrosion treatment, and acceptance through dry and wet tests of every component. The procedure is an open tender under international treaties, with the buyer's documents, submissions and any clarifications in German. Bidding consortia and partial tenders are not allowed, while subcontractors and variant offers are permitted. Eligibility and award criteria sit within the tender documentation, and the notice does not disclose any price-to-quality weighting. The notice was published on 14 November 2026 and closes on 29 January 2027 at 11:00 CET. Bids must be lodged online through the national procurement platform, and a physical copy must also reach the buyer's procurement office by 12:00 on the same closing date.

Full description from the source

The Abwasserverband Thurau (Thurau Wastewater Association) is procuring the sludge-handling conveyor technology and mechanical equipment for the loading station for skip containers (Muldenverladestation) at the West stage of the new ARA Thurau wastewater treatment plant, to be built at the Uzwil site in Niederuzwil (9420, SG, Switzerland). The new plant replaces the existing plants in Wil, Jonschwil, Zuzwil and Uzwil and is designed for 130,000 population equivalents. The scope covers the sludge-contact conveyor technology and the mechanical equipment for the skip loading station. It includes the main screw conveyor from the decanter, the distribution screw conveyors for skip filling, pneumatic shut-off devices, covers with integrated through-draft ventilation, pneumatically operated tipping devices for the skips, and the floor-mounted guide rails. The skips (Mulden) are included in the tender, as the title indicates. Required services are complete process engineering design, factory fabrication, delivery to the construction site, ready-to-operate installation, corrosion protection, and successful commissioning including dry and wet acceptance tests for all components, in accordance with the tender documentation. The contract is classified as a contract for work and services with goods supply. The date of execution is defined in the tender documents and the contract duration is not specified. The contract cannot be extended. A round of questions closes on 04.12.2026. Submissions are due 29.01.2027 at 12:00 CET, and tenders remain valid for 240 days after the submission deadline. Public opening is not held. The tender documentation is in German only, and CPV codes include 42996900 (sludge treatment plant) as the main code.

Bidder eligibility

Eligibility criteria are specified in the tender documentation, which is available on simap.ch after user registration and login. Bidding consortia are not permitted, and multiple tenders from bidding consortia are not permitted. Subcontractors are permitted, and multiple tenders from subcontractors are permitted. Variants are permitted. Partial tenders are not permitted. The procedure is an open procedure within the scope of international treaties. Language of procedure and tenders is German.

How bids are scored

Award criteria are specified in the tender documentation. No price/quality split or weightings are disclosed on the notice page.

Key requirements

  • Process design and dimensioning of sludge conveying and skip-loading equipment
  • Factory fabrication, delivery to site, assembly, anti-corrosion protection and commissioning with dry and wet tests
  • Scope includes main screw conveyor after centrifugal decanter, pneumatic closures, ventilated covers and pneumatic skip tipping devices

Procurement contact

The notice names a procurement contact for clarification questions.

CPV codes

Relevant sectors

Water tendersInfrastructure

How this compares

How this compares

  • Compared with 235 similar tenders (water in Switzerland) listed in the last 12 months.
  • It allows 76 days to respond, longer than the typical 40 days across 230 similar tenders.
  • The same organisation listed 13 other similar tenders here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

Sourcesimap.ch (Switzerland)
Published14 Nov 2026
Closes29 Jan 2027, 11:00 UTC
Buyer typeGovernment
TypeMixed
DeliveryOn-site
CountrySwitzerland
RegionCH-SG
SubmissionOpen procedure. Online submission via simap.ch, with physical submission also re
Last verified21 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)