Supply, Installation & Commissioning of On-Grid Hybrid Inverter and Battery for IDCOL. 2026 Tender
Procurement Unit, IDCOL
In context
This is a contract notice published by a government body covering the supply of goods. Bids are invited through an open procedure. Delivery covers Bangladesh (Asia). It is classified under Energy Storage and Renewable Energy against the sustainability taxonomy rather than matched on keywords.
IDCOL's Procurement Unit is tendering the supply, installation and commissioning of on-grid hybrid inverters and batteries, a national competitive tender in Bangladesh. It suits local or regional electrical suppliers and installers with battery energy storage and solar inverter experience.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
IDCOL's Procurement Unit is inviting open national competitive tenders (NCT, Open Tendering Method) for the supply, installation and commissioning of on-grid hybrid inverters and batteries. The procurement is reference IFT/IDCOL/2026-27/OF/G-25 (package IDCOL/2026-27/OF/G-25), categorised as installation services of electrical and mechanical equipment, and is funded from IDCOL's own funds. The tender is a single-lot package. The scope covers the goods (on-grid hybrid inverters and batteries), their installation, and commissioning. The installation location is listed as IDCOL, UTC Building, Level 16, 8 Panthapath, Kawran Bazar, Dhaka-1215. The tentative contract period runs from 25 November 2026 to 25 November 2027, which implies a delivery and installation window of about one year. A pre-tender meeting was scheduled between 29 October and 3 November 2026. Tender document price is BDT 1,500 and tender security is BDT 70,000. Tender validity runs to 11 March 2027 and tender security validity to 8 April 2027.
Bidder eligibility
Eligibility of tenderers is governed by the Tender Data Sheet (TDS), which is not reproduced on the notice page. Specific registrations, classifications, experience requirements and financial thresholds must be checked in the tender documents.
How bids are scored
Evaluation type is lot-wise. No price/quality split or scoring weightings are disclosed on the notice page; refer to the tender documents.
Key requirements
- ✓Supply of on-grid hybrid inverters and batteries
- ✓Installation and commissioning at specified sites
- ✓National competitive tendering (NCT) under one-time method (OTM)
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
About this sector
Energy storage funding spans batteries, long-duration storage, thermal storage and the controls that dispatch them. Research calls focus on chemistry and system cost. Demonstration programmes test grid services, while tenders buy capacity, flexibility and installation contracts. Buyers usually want evidence of safety certification, round-trip efficiency and a credible route to grid connection.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →