Skip to content
Raise Lens
TENDER · TED (EU)governmentservices

Technical services – Zukunft Bahnhof Bern, Bausteine 1,2,4, 3a, 3b, Umweltbaubegleitung: 3'000 h externe Projektleitung 2026 Tender

Fachstelle Beschaffungswesen Stadt Bern

In context

This is a contract notice published by a government body covering services. Bids are invited through an open procedure. Delivery covers Switzerland (Europe). It is classified under Environmental Justice and Carbon Markets and MRV against the sustainability taxonomy rather than matched on keywords.

Summary

The City of Bern is procuring about 3,000 hours of external environmental construction supervision (Umweltbaubegleitung) for the Zukunft Bahnhof Bern rail station project. It suits Swiss environmental engineering firms with construction-site compliance experience and permit-condition tracking capability.

Summary by Raise Lens from the official notice · 25 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The tender covers the technical services mandate "Umweltbaubegleitung" (UBB, environmental construction supervision) for the Zukunft Bahnhof Bern project, which is part of the wider procurement titled "Technical services – Zukunft Bahnhof Bern, Bausteine 1, 2, 4, 3a, 3b, Umweltbaubegleitung: 3'000 h externe Projektleitung". It is run as a public procurement procedure by the Fachstelle Beschaffungswesen of the City of Bern. The contractor acts as the environmental construction supervisor. Its duties include monitoring and advising on environmental matters during construction, ensuring compliance with environmental laws, ordinances, guidelines and permit conditions, and assessing environmental problems on site. It advises the client on environmental questions and keeps the enforcement and conditions control (Vollzugs- und Auflagenkontrolle, VAK) up to date and documented, for example in a list or database. It also produces evidence of compliance for the authorities and maintains a register of open environmental items, ideally integrated into the site meeting's action list. The UBB is responsible for all environmental aspects of the project, including planning, tendering, construction logistics, installation areas, transport routes, material flows, construction execution, and protection and reclamation measures. It includes soil-related construction supervision where required. The wording of the building permit is decisive for implementing the conditions. Environmental conditions not yet known when the specification was drafted must also be fulfilled or checked by the contractor. Any demonstrably additional work is compensated under the base contract terms. Detailed services are set out in Annex 01 (Leistungsbeschrieb), and the permit conditions are in Annex 03 (Auflagen Gesamtbauentscheid zu ÜO ZBBS dated 30.10.2025). Product, brand or type references are avoided, and equivalent alternatives are accepted if the bidder demonstrates equivalence. The stated effort is 3,000 hours of external project management, and the contract duration is not stated on the page.

Key requirements

  • ✓Environmental construction supervision (UBB) across planning, tendering and construction phases
  • ✓Monitor and enforce environmental permit conditions and the VAK control list of authority requirements
  • ✓Maintain environmental deficiency lists and documentation for authorities; advise the client on environmental matters

How this compares

  • Compared with 15 similar tenders (env justice in Switzerland) listed in the last 12 months.
  • It allows 32 days to respond, shorter than the typical 41 days across 12 similar tenders.
  • The same organisation listed 1 other similar tender here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Environmental justice funding supports communities most exposed to pollution and climate harm, with an emphasis on local leadership. It is offered by public programmes and foundations, often as grants to community organisations and partnerships. Calls typically ask how residents are involved in decisions and how benefits stay in the community.