Thermal insulation work – Johann Ettinger German High School transformation into NZEB 2026 Tender
Original: Thermal insulation work – Transformarea Liceului Teoretic German „Johann Ettinger” în clădire NZEB
Municipiul Satu Mare
In context
This is a contract notice published by a government body covering construction and works. Bids are invited through an open procedure. Delivery covers Romania and the European Union (Europe). It is classified under Heating and Cooling, Energy Efficiency and Sustainable Buildings and 2 others against the sustainability taxonomy rather than matched on keywords.
This tender procures comprehensive energy-efficiency retrofit and deep renovation of a German-language secondary school complex (three buildings: school, dormitory, canteen) to achieve nearly-zero-energy building (NZEB) standard, including thermal insulation, HVAC modernization, photovoltaic installation, and smart controls. Bidders should be construction/engineering firms with experience in building-envelope retrofit, renewable-energy integration, and complex multi-building energy-performance projects in Romania.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Municipiul Satu Mare is procuring execution works for the transformation of the German Theoretical High School "Johann Ettinger" into an NZEB (nearly zero-energy building). The works cover energy-efficiency upgrades to three buildings of the school: C1 (high school building), C3 (boarding house / internat) and C6 (canteen). The stated aim is to rehabilitate, modernise and equip the educational infrastructure. The scope, as set out in the technical project, includes architectural works, structural works, electrical, sanitary, thermal, and ventilation installations, domestic hot water systems, photovoltaic installations, automation, tests and commissioning, As-Built documentation, and remediation of any non-conformities up to final acceptance. The main work categories are rehabilitation of the building envelope, external wall insulation, floor and roof thermal insulation, window and door replacement, waterproofing renewal, interior finishing restoration, modernisation of electrical, sanitary and thermal systems, mechanical ventilation with heat recovery, installation of photovoltaic systems, intelligent control and automation systems, and execution of all technological tests and commissioning of installations. Expected outcomes include a lower annual energy consumption, reduced primary energy use and CO2 emissions, improved thermal and acoustic comfort, lower operating costs, greater use of renewable energy, and better conditions for the educational process. The contract duration, budget, and delivery schedule are not stated on the page.
Key requirements
- ✓Thermal envelope retrofit: exterior wall, roof, and floor insulation across three buildings
- ✓HVAC modernization: heat-recovery ventilation, modern heating systems, domestic hot-water preparation
- ✓On-site renewable energy: photovoltaic system installation and integration
- ✓Smart building controls and automation systems for energy management
- ✓Full compliance testing, commissioning, As-Built documentation, and remediation to final handover
Relevant sectors
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →