Trinkwasserkraftwerk Feschel 2026 Tender
Gemeinde Guttet-Feschel (SRP Ingenieur AG)
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Switzerland (CH-VS). It is classified under Renewable Energy, Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
The Gemeinde Guttet-Feschel is tendering the design, supply, installation, testing and commissioning of the electromechanical equipment for a small hydropower plant that will generate electricity from spring water in an existing drinking-water pipeline. Suited to bidders with hydro turbine and electromechanical engineering capability, typically specialist equipment suppliers or engineering contractors able to deliver a single-site installation.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Die Gemeinde Guttet-Feschel beabsichtigt, das Energiepotenzial des Quellwassers der Bachalpe hydroelektrisch zu nutzen. Mit dieser Idee wurde im Jahr 2023 die alte Trinkwasserleitung zwischen der Brunnenstube auf der Bachalp auf ca. 2'000 m ü. M. und dem Druckbrecherschacht auf ca. 1'467 m ü. M. vollständig erneuert und als Druckleitung konzipiert. Das Projekt sieht vor, eine neue Zentrale an den bestehenden Druckbrecherschacht anzubauen. Von dort aus soll das turbinierte Quellwasser direkt in den bestehenden Druckbrecherschacht drucklos eingeleitet werden. Die vorliegende Ausschreibung beinhaltet die Planung (Engineering, Bemessung), Fertigung, Transport, Montage, Prüfung und Inbetriebnahme inkl. Schulung für die gesamten elektromechanischen Ausrüstungen für den Betrieb mit Trinkwasser beginnend vom bergseitigen Flansch vor dem Absperrorgan bis und mit Anschluss an den Klemmen der bauseits gelieferten NS-Verteilung in der Zentrale. Weitere Informationen sind dem Beschrieb im Pflichtenheft zu entnehmen.
Key requirements
- ✓Engineering, design and dimensioning of electromechanical equipment for drinking-water hydropower
- ✓Manufacture, transport, installation, testing and commissioning, including operator training
- ✓Scope runs from the mountain-side flange before the shut-off valve to the NS distribution terminals in the powerhouse
CPV codes
Relevant sectors
How this compares
- Compared with 76 similar tenders (renewables in Switzerland) listed in the last 12 months.
- It allows 48 days to respond, longer than the typical 41 days across 69 similar tenders.
- The same organisation listed 1 other similar tender here in the last 12 months.
Closest open tenders
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →