Vervanging installaties zwembad Overbosch 2026 Tender
Gemeente Den Haag
- Value
- Not stated · check listing
- Closes
- 27 Nov 2026
- Where
- Netherlands
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Netherlands (Europe). It is classified under Energy Efficiency, Heating and Cooling and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The Gemeente Den Haag tender covers replacing gas boilers with a hybrid air-water heat pump system at the Overbosch swimming pool, along with air-handling units, distribution, controls, demolition and related building works. It suits installation contractors with experience in heat pumps, HVAC retrofits and public building works, most likely as a prime or a subcontractor.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Gemeente Den Haag is procuring the replacement and adaptation of the building-bound installations at the Overbosch swimming pool as part of a renovation and sustainability upgrade. The works are planned in phases: the installations are being addressed now, and structural work on elements such as the façade and roof will follow at a later stage. The scope includes replacing the existing gas boilers with a hybrid arrangement using air-to-water heat pumps, and replacing the air handling units. It also covers replacing and adapting distribution equipment, control systems and pipe routes, plus demolition and dismantling of the existing installations. Ancillary building works are included where needed for the installation work. These are openings and penetrations, fire-resistant sealing, and roof penetrations. The contractor must also carry out and coordinate roofing works on the roof sections where the air handling units and heat pumps are installed. Temporary facilities are included where necessary. The contract ends with commissioning, testing, inspection and handover of the installations. The page does not state a planned start date, completion date or contract duration.
Key requirements
- Replace existing gas boilers with a hybrid system using air-water heat pumps
- Replace air-handling units and distribution, control and piping systems, including demolition of existing installations
- Deliver building provisions (penetrations, fire-resistant seals, roof penetrations), commissioning, testing and handover
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)