TENDER · TED (EU)soeworks

Works for modernising and electrifying rail line 24 Piotrków Trybunalski–Bełchatów 2026 Tender

Original: Construction work – Wykonanie robót dla Zadania pn.: „Modernizacja i elektryfikacja linii kolejowej nr 24 na odcinku Piotrków Trybunalski – Bełchatów z wydłużeniem do Bogumiłowa” realizowanego w ramach Programu Uzupełniania Lokalnej i Regionalnej Infrastruktury Kolejowej - Kolej+ do 2032 roku

PKP Polskie Linie Kolejowe S.A.

In context

This is a contract notice published by a state-owned enterprise covering construction and works. Bids are invited through an open procedure. Delivery covers Poland (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

PKP PLK seeks a contractor to modernise and electrify railway line 24 between Piotrków Trybunalski and Bełchatów, extending it to Bogumiłów, under the Kolej+ programme. Bidders best suited are large rail-infrastructure contractors with electrification and track-record capacity, typically as prime or in consortium.

Summary by Raise Lens from the official notice · 29 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

PKP Polskie Linie Kolejowe S.A. is procuring construction works for the modernisation and electrification of railway line no. 24 on the Piotrków Trybunalski – Bełchatów section, with an extension to Bogumiłów. The project is funded under the Kolej+ programme (Programu Uzupełniania Lokalnej i Regionalnej Infrastruktury Kolejowej – Kolej+ do 2032 roku). The supplementary information provided covers the contract duration. The estimated period of performance is 28 months from contract signature (per § 4 of the Conditions of Contract in Volume II of the SWZ). Completion of all works for the base scope and any exercised options must be confirmed by the buyer's final acceptance, including handover of as-built documentation and certification documents, within 20 months of contract signature. Delivery of permits for placing structural subsystems into service under the Rail Transport Act is due no later than 8 months after the buyer's final acceptance. The page excerpt does not contain the full scope description, deliverables, or technical specifications. It refers to a base scope and optional works that may be activated.

Key requirements

  • ✓Complete all works within 20 months of contract signing, with a 28-month total execution period
  • ✓Deliver as-built documentation and certification documents, and obtain authorisations for putting structural subsystems into service within 8 months of final acceptance
  • ✓Scope covers base scope plus optional items for railway modernisation and electrification under Polish rail transport law

Relevant sectors

Infrastructure

About this sector

Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.