Works for new underground prefabricated distribution centre and five 15 kV lines, Madrid 2026 Tender

Original: Obras para un nuevo centro de reparto en edificio prefabricado subterráneo y cinco nuevas líneas subterráneas de media tensión de 15 kv y simple circuito en el interior de la Finca Vista Alegre, en el término municipal de Madrid

Consejería de Economía, Hacienda y Empleo

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Spain (Europe). It is classified under Grid Modernization and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Construction of a new underground distribution centre in a prefabricated building and five 15 kV medium-voltage underground electrical lines within a Madrid estate. Bidders must have civil engineering and electrical infrastructure expertise, particularly in underground utility installation.

Summary by Raise Lens from the official notice · 17 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The contracting authority, the Consejería de Economía, Hacienda y Empleo of the Comunidad de Madrid, is procuring civil and electrical works in the Finca Vista Alegre, within the municipality of Madrid. The works comprise a new distribution centre housed in an underground prefabricated building, plus five new underground 15 kV medium-voltage single-circuit power lines. The tender is an open simplified procedure under Ley 9/2017 (LCSP), classified as a works contract with CPV code 45315500-3. It is not subject to harmonised (EU) regulation and is not EU-funded. The execution period is 11 months. The base budget is €385,501.08 excluding taxes, or €466,456.31 including taxes. Execution is governed by the project (proyecto de ejecución) and the administrative and technical specifications, which are published on the portal. Bidders submit electronically through the Licit@ system on the Portal de Contratación Pública de la Comunidad de Madrid. Administrative documentation and economic offers are opened on 4 November 2026 at 10:00. Opening sessions are not public; results will be posted to the electronic notice board.

Bidder eligibility

Not disclosed in the notice page. Detailed solvency, classification, and registration requirements are presumably set out in the Pliego de Cláusulas Administrativas Particulares (14.9 MB), which was not available in the page text.

How bids are scored

Not disclosed in the notice page. Award criteria, price/quality weightings, and scoring methodology are presumably set out in the Pliego de Cláusulas Administrativas Particulares.

Key requirements

  • ✓Design and construction of underground prefabricated distribution centre building
  • ✓Installation of five 15 kV medium-voltage underground electrical lines with simple circuit configuration
  • ✓Work location: Finca Vista Alegre, Madrid municipal territory
  • ✓Compliance with Spanish electrical grid standards and underground utility regulations

Procurement contact

The notice names a procurement contact for clarification questions.

CPV codes

Relevant sectors

Grid Mod tendersInfrastructure

About this sector

Grid modernisation covers transmission, distribution, smart meters, interconnectors and the software that balances a network with more variable supply. Funding comes as innovation calls for network operators and suppliers as well as large public tenders for equipment and works. Applicants are usually asked to show technical readiness and experience working with regulated network companies.