This grant closed on 3 March 2026. The deadline passed 266 days ago.
You can no longer apply, but the details below are kept for reference, and there are similar open opportunities in the sidebar.
Programa PORT-EOLMAR Grant
- Amount
- Not stated · check listing
- Deadline
- 3 Mar 2026, 12:00 Peninsular timeDeadline passed
- Who can apply
- Local authorities, engineering contractors, large companies and 1 more · Spain
In context
This call is open to local authorities, engineering and construction contractors and large companies and 1 other. Funding is a grant. Coverage is read from the notice itself: Spain.
Summary
PORT-EOLMAR provides non-repayable subsidies to adapt Spanish ports of general interest with berths, construction, storage and assembly areas for offshore wind and other marine renewables. It is aimed at port authorities and related investment project promoters in Spain, funded under the EU RecoveryEU/REPowerEU framework.
About this grant
Eligible investment covers new or adapted berths, construction areas, storage and assembly facilities suited to marine renewable systems and structures, with the aim of strengthening logistics capacity on land and at sea and building out the offshore renewables supply chain. Port authorities and operators, along with local authorities, engineering contractors, large companies and consortia, are the kinds of applicants the call is open to. The support is a non-repayable grant awarded through competitive concurrence under the Recovery and Resilience Facility within NextGenerationEU, specifically Investment C31.I3 of Spain's recovery plan. The first call holds EUR 212 million in total. Only new infrastructure projects are supported, and they may run until 2030. No minimum or maximum grant per project is stated, and the eligibility details are set out in the governing regulation, Orden TED/1488/2025. The first call's application window runs from 28 January to 3 March 2026, with applications submitted electronically through the funder's electronic headquarters. Projects must physically adapt infrastructure within ports of general interest.
Full description from the source
The PORT-EOLMAR programme provides grants for investment projects that physically adapt national port infrastructure in ports of general interest (Puertos de Interés General) so they can support offshore wind and other marine renewable energies in Spain. The aim is to strengthen logistics capacity on land and at sea by creating or adapting berths, construction areas, storage and assembly areas suited to marine renewable systems and structures, and so build out the offshore renewables value chain. The programme is funded by the Recovery and Resilience Facility under NextGenerationEU, within Investment C31.I3 'Ayudas e inversión en cadena de valor de renovables y almacenamiento' of Component 31 (REPowerEU chapter) of Spain's Recovery, Transformation and Resilience Plan. The first call (1ª Convocatoria) is awarded through competitive concurrence as non-repayable subsidies for new infrastructure projects that may run until 2030. The page gives a total first-call allocation of EUR 212 million, but does not state a per-project minimum or maximum grant. Applications are submitted through the IDAE electronic headquarters. The first call's application window opened at 12:00 Peninsular time on 28 January 2026 and closed at 12:00 Peninsular time on 3 March 2026. The programme is governed by Orden TED/1488/2025 and the call was approved by IDAE's Board resolution of 23 December 2025 (BOE 8 January 2026, BDNS 877815). The page also notes that a final resolution was published on 26/06/2026.
This grant has closed
Similar grants are open now. Pro keeps the official link on every listing, closed ones included.
Eligibility
The page does not list specific applicant organisation types, scale or stage requirements. It describes eligible actions as investment projects for the creation or physical adaptation of national port infrastructure in ports of general interest, aimed at offshore wind and other marine renewables. Eligibility details, including applicant types, are referred to the regulatory bases (Orden TED/1488/2025) and the first call resolution, which the page links to but does not reproduce. Support is limited to new infrastructure projects that can run until 2030.
Key requirements
- Investment must physically adapt infrastructure in Puertos de Interés General to support offshore wind and marine renewables
- Applications submitted via the IDAE electronic headquarters within the first call window (28 January to 3 March 2026)
- Funded under NextGenerationEU Component 31 C31.I3 and governed by Orden TED/1488/2025 with competitive award and projects running until 2030
Funder contact
The notice names a programme contact you can speak to before applying.
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Closed · kept for reference
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this listing. Usually asked for in capital grants; typical only, not this funder’s list. Check the official listing.
- Project plan with timeline and milestones
- Quotes or cost estimates for the works or equipment
- Proof of ownership, lease or permission for the site
- Planning permission or permits, where needed
- Evidence of match funding
- Latest annual accounts