Skip to content
Raise Lens
idae

SOLBAL 2: Investment Aid for Solar Photovoltaic Electricity Production Facilities in the Balearic Islands Grant

In context

This call is open to small and medium-sized businesses, large companies and engineering and construction contractors and 1 other, at scale-up and mature. Funding is a grant. Coverage is read from the notice itself: Spain.

Summary

SOLBAL 2 is an IDAE capital investment aid programme, co-financed by FEDER, that provides non-repayable grants for building grid-connected solar photovoltaic generation plants in the Balearic Islands. It targets companies and developers building PV installations above 100 kW, including rooftop, canopy, and ground-mounted projects.

Summary by Raise Lens from the official notice · 20 Oct 2026Accurate?

About this grant

SOLBAL 2 is a capital investment aid programme run by IDAE (Instituto para la Diversificación y Ahorro de la Energía) for the construction and commissioning of solar photovoltaic electricity generation facilities located in the Balearic Islands (Illes Balears). The programme is co-financed by the European Regional Development Fund (FEDER) and is regulated by bases set out in Orden TEC/1380/2018 as amended by Orden TED/1035/2024. The second call was established by a Resolution of 17 December 2020 and resolved in 2021, and the page also reports deadline extensions for completing works and justification. The aid supports installations of more than 100 kW nominal inverter power (measured as the sum of inverter nominal powers for eligibility, with installed capacity for aid calculation based on peak module power), connected to the distribution and/or transport network, occupying no more than 20 hectares. Self-consumption installations and integrated storage are also eligible. Excluded are installations that previously received the specific remuneration regime under RD 413/2014 (unless expressly waived), used or non-new main equipment, facilities not connected to the grid, and those lacking the required grid-access guarantee or access request. Projects are grouped into three types: IT1 rooftop or car-park canopy installations, IT2 ground-mounted up to 5 MWp, and IT3 ground-mounted above 5 MWp. Aid is a non-repayable grant, with an optional FEDER advance, awarded by competitive concurrence and scored by unit aid requested per MWp, solar resource, and administrative feasibility, with a maximum of 24 points. Aid is incompatible with other public aid for the same purpose, and a cap of EUR 15,000,000 per company per project applies.

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

Eligibility

Beneficiaries must be legal persons meeting the requirements of the call bases and of Ley 24/2013 on the Electricity Sector. Excluded are legal persons subject to Article 13 of Ley 38/2003 General de Subvenciones prohibitions, those subject to pending recovery orders for aid declared illegal by the European Commission, and undertakings in difficulty under the EU Rescue and Restructuring Guidelines (2014/C 249/01). The geographic scope is restricted to the Illes Balears. Eligible installations must be new-equipment solar PV above 100 kW, connected to the grid, under 20 ha, and must not have previously been granted the RD 413/2014 specific remuneration regime unless expressly waived before the aid resolution. Public administrations that do not require an economic guarantee are exempt from that requirement.

How it's scored

Applications are scored out of 24 points by IDAE under Annex I of the call. Criteria are: unit aid amount requested in EUR/MWp (maximum 8 points), solar resource (maximum 10 points), and administrative feasibility (maximum 6 points). Ties are broken first by the unit aid score, then by the solar resource score, then by the date, hour and minute of submission. Evaluation is through competitive concurrence on a non-discriminatory tender basis assessing administrative, economic and technical requirements. The page does not describe the panel composition.

Key requirements

  • ✓Solar PV installation above 100 kW nominal inverter power, connected to distribution or transport network, occupying no more than 20 hectares
  • ✓Main equipment must be new; installations previously under RD 413/2014 specific remuneration are excluded unless waived
  • ✓Must hold grid-access guarantee or access request; aid is incompatible with other public aid for the same purpose and capped at EUR 15M per company per project

Frequently asked questions

Who can apply for SOLBAL 2: Investment Aid for Solar Photovoltaic Electricity Production Facilities in the Balearic Islands?
Eligibility covers organisations in ES; sme, large-company, engineering-contractor, consortium. See the eligibility criteria above for the full conditions.

How this compares

  • Compared with 44 similar grants (renewables in Spain) listed in the last 12 months.
  • Similar grants that state a value range from $4.5m to $673m, with a median of $165m (9 grants).
  • The same organisation listed 23 other similar grants here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

Funding route · no open call
Deadline not stated · check listing
Get the official link (free account)

Free accounts: 1 official link a month · Pro: every link

Quick facts

Sourceidae
EligibilityES
Org typessme, large-company, engineering-contractor, consortium
Last verified20 Oct 2026

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.