Skip to content
Raise Lens
Enova (Norway)

Storre Varmesentraler Ny Grant

Funding route · apply any time

Amount
NOK 10.1M
Deadline
Rolling: no fixed deadline
Who can apply
SMEs, large companies, non-profits and 2 more · Norway

Free accounts: 1 official link a month · Pro: every link

In context

This call is open to small and medium-sized businesses, large companies and non-profits and 2 others. Funding is a grant. Coverage is read from the notice itself: Norway.

Summary

Enova's programme pays fixed per-kW grants to businesses, sports facilities and industrial premises that replace fossil or direct-electric space heating with renewable central heating plants such as biomass boilers, heat pumps or district heating substations. It aims to reduce peak electricity demand on the Norwegian grid, with applications assessed on a rolling basis until the offer ends in summer 2027.

Summary by Raise Lens from the official notice · 11 Nov 2026Accurate?

About this grant

The Storre Varmesentraler Ny call provides grant support for building new large-scale district heating plants in Norway, with the aim of cutting energy use and emissions. Money is paid per kilowatt of installed capacity, with rates set by technology. Eligible options include biomass boilers, several kinds of heat pump, and district heating customer substations, priced between 750 and 3,000 kr/kW. This covers SMEs, large companies, nonprofits, local authorities and engineering contractors. No numerical scoring criteria are described.

Full description from the source

Enova offers grants to businesses that want to invest in a central heating plant (varmesentral) running on renewable energy for space heating. The programme targets buildings, sports facilities and industrial premises that currently heat with fossil oil, fossil gas or direct electricity. The stated aim is to reduce peak electricity demand, since Norway uses close to 50 TWh of electricity for heating each year and cold-day peaks strain the grid. Eligible technologies include biomass boilers (biokjel), several heat pump types (rock/borehole, sea/water, ground, and air-to-water) and district heating customer substations (kundesentral tilkoblet fjernvarme). Support is paid as a fixed rate per installed capacity (kr/kW), and the rate depends on the technology. Biomass boilers receive 2 000 kr/kW, borehole heat pumps 2 500 kr/kW, ground and water-source heat pumps 2 000 kr/kW, air-to-water heat pumps with an accumulator 750 kr/kW, and district heating substations 3 000 kr/kW. Optional add-ons raise the rate: an accumulator adds 100 kr/kW, a local heating network (nærvarme) adds 500 kr/kW, an electrostatic filter in a biomass boiler adds 200 kr/kW, a natural refrigerant in a heat pump adds 1 000 kr/kW, and conversion to a water-based heating system adds 3 000 kr/kW. Support is capped at 3 MW of installed capacity and at 10 million NOK per project. The programme gives specific technical requirements. Air-to-water heat pumps must include an accumulator of at least 500 litres. Biomass boilers must be able to store at least three days of fuel. Energy meters are required for heat pumps. The programme is described as open at all times with no fixed deadline. Applications are processed on a rolling basis and assessed individually, and the terms may be adjusted one to two times a year until the offer ends in summer 2027.

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

Eligibility

Eligible applicants are enterprises (foretak) that are considering investing in a renewable heating solution. The enterprise must be registered in the Norwegian company register (Foretaksregisteret) and must meet the general requirements for state aid. The programme is run by Enova, a Norwegian state enterprise, so the scheme is limited to Norway.

How it's scored

Applications are processed continuously and assessed individually. Processing time depends on how complex the case is and on Enova's available capacity. Incomplete or deficient applications may be rejected. The page does not describe numerical scoring criteria, weightings or panel composition.

Key requirements

  • Eligible technologies include biomass boilers, borehole/ground/water/air-to-water heat pumps and district heating customer substations, with rates from 750 to 3,000 kr/kW
  • Support capped at 3 MW installed capacity and 10 million NOK per project; add-ons such as accumulators, local heating networks and natural refrigerants raise the rate
  • Air-to-water heat pumps need an accumulator of at least 500 litres; biomass boilers must store at least three days of fuel; energy meters required for heat pumps

Funder contact

The notice names a programme contact you can speak to before applying.

Frequently asked questions

How much funding does Enova offer?
Storre Varmesentraler Ny offers NOK 10.1M.
When is the Storre Varmesentraler Ny deadline?
This is a rolling call with no fixed deadline, so applications are accepted on an ongoing basis.
Who can apply for Storre Varmesentraler Ny?
Eligibility covers SMEs, large companies, non-profits, local authorities and engineering contractors in Norway. See the eligibility criteria above for the full conditions.

How this compares

About this sector

Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new grants like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceEnova (Norway)
EligibilityNorway
Org typesSMEs, large companies, non-profits, local authorities, engineering contractors
Last verified11 Nov 2026

Documents to prepare

We found no document list in this listing. Usually asked for in innovation and SME grants; typical only, not this funder’s list. Check the official listing.

  • Business or project plan
  • Company registration documents
  • Latest financial statements
  • Project budget and cost breakdown
  • CVs of the key team members
  • State aid or de minimis declaration, where relevant